{"id":7692,"date":"2024-04-02T02:32:57","date_gmt":"2024-04-02T02:32:57","guid":{"rendered":"https:\/\/www.hiclover.com\/?p=7692"},"modified":"2024-04-02T02:32:57","modified_gmt":"2024-04-02T02:32:57","slug":"incenerator-system","status":"publish","type":"post","link":"https:\/\/gofullday.com\/incineration\/incenerator-system\/","title":{"rendered":"Incenerator System"},"content":{"rendered":"<\/p>\n<table width=\"399\">\n<tbody>\n<tr>\n<td width=\"291\"><strong>Incenerator<\/strong><\/td>\n<td width=\"55\"><\/td>\n<td width=\"53\"><\/td>\n<\/tr>\n<tr>\n<td width=\"291\">Supply, installation and testing of medical waste incinerator with a capacity of 75 kilograms \/ hour, operated by LPG and including all accessories with chimney in accordance with the technical specifications and public health regulations<\/td>\n<td width=\"55\">Item<\/td>\n<td width=\"53\">2<\/td>\n<\/tr>\n<tr>\n<td width=\"291\">Incinerators room for 3 incinerators as item 3-1-1, and waste store for keeping wastes for 7 days, including all constructions by reinforced concrete with Incenerator and store equipment, all wiring, lighting, water supply and drainage<\/td>\n<td width=\"55\">Item<\/td>\n<td width=\"53\">1<\/td>\n<\/tr>\n<tr>\n<td width=\"291\">Provide Incinerators room &amp; waste store with fire fighting system, including sprinklers, approval of water source at site, fire alarm system contains sensors for heat &amp; smoke, to be linked with the hospital fire alarm systems<\/td>\n<td width=\"55\">Item<\/td>\n<td width=\"53\">1<\/td>\n<\/tr>\n<tr>\n<td width=\"291\">Supply, installation &amp; testing of ventilation system of Incenerator room &amp; store by ROOF TOP EXHAUST FANS with HEPA FILTER, rate of change of air 5 times per hour, with ducts and air grills<\/td>\n<td width=\"55\">Item<\/td>\n<td width=\"53\">1<\/td>\n<\/tr>\n<tr>\n<td width=\"291\">Supply, installation &amp; testing DUCTED SPLIT UNITS at waste store with sufficient capacity to maintain the internal temperature at 14 degrees Celsius in summers and winters<\/td>\n<td width=\"55\">Item<\/td>\n<td width=\"53\">1<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"excerpt":{"rendered":"<p>Incenerator Supply, installation and testing of medical waste incinerator with a capacity of 75 kilograms \/ hour, operated by LPG and including all accessories with chimney in accordance [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":2005,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"_links":{"self":[{"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/posts\/7692"}],"collection":[{"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/comments?post=7692"}],"version-history":[{"count":1,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/posts\/7692\/revisions"}],"predecessor-version":[{"id":9763,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/posts\/7692\/revisions\/9763"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/media\/2005"}],"wp:attachment":[{"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/media?parent=7692"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/categories?post=7692"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/tags?post=7692"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}