{"id":6717,"date":"2024-12-14T18:40:12","date_gmt":"2024-12-14T18:40:12","guid":{"rendered":"https:\/\/www.hiclover.com\/?p=6717"},"modified":"2024-12-14T18:40:12","modified_gmt":"2024-12-14T18:40:12","slug":"china-incinerator-4","status":"publish","type":"post","link":"https:\/\/gofullday.com\/incineration\/china-incinerator-4\/","title":{"rendered":"China incinerator"},"content":{"rendered":"<\/p>\n<p> Incinerator Of Burning Capacity 30 kg\/hr = 1 No <\/p>\n<p> The Incineration System comprises of: <\/p>\n<p> I. Main Incinerator with <\/p>\n<p> A. Refractory lined Main and Secondary Chamber.<\/p>\n<p> VII.   Cyclonic kind droplet separator cum recirculation tank in Mild steel<br \/>\nBetween burner &#038; tank.  <\/p>\n<p> XVII.  Operati ng tools &#038; tackles like rake, hoe, shovel, two teeth scrapper.  <\/p>\n<p> XVIII.  Caustic dosing system comprising of Tank- Agitator and pump <\/p>\n<p> XIV.  FUEL LDO DIESEL.  <\/p>\n<p> IX.  I.D. Fan with MSRL casing &#038; SS 316 L impeller with motor.  <\/p>\n<p> X. Recirculation Pump (SS 316) with Motor along with valves &#038; piping in<br \/>\nSS 316.  <\/p>\n<p> XI.  Overhead HDPE Water tank for scrubber along with water piping<br \/>\nB. Refractory lined main charging door and ash cleaning door.  <\/p>\n<p> II i. 1 No.  Fully automatic oil burner for primary room.<br \/>\nbetween tank and scrubber.  <\/p>\n<p> XII.  Interconnecting ducting within the battery limits.  <\/p>\n<p> XIII.  Instruments, valves, dampers and fittings within battery limits.  <\/p>\n<p> XIV.  PLC based Control Panel with essential instruments.  <\/p>\n<p> XV.  Data recording apparatus in the kind of Printer.  <\/p>\n<p> XVI.  Oil tank of 500 ltr capacity along with oil piping, valves &#038; strainers<br \/>\nii.  1 No.  Fully automatic oil burner for secondary space.  <\/p>\n<p> III.Centrifugal forced draft combustion air fan with motor.  <\/p>\n<p> IV.  Flow measurement device on the Pri mary &#038; Secondary air ducting.  <\/p>\n<p> V. Auto-loading in the Kind of Dual FDV mechanism with outer gate<\/p>\n<p>XIV. FUEL LDO DIESEL.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Incinerator Of Burning Capacity 30 kg\/hr = 1 No The Incineration System comprises of: I. Main Incinerator with A. Refractory lined Main and Secondary Chamber. VII. Cyclonic kind [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":2019,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"_links":{"self":[{"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/posts\/6717"}],"collection":[{"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/comments?post=6717"}],"version-history":[{"count":1,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/posts\/6717\/revisions"}],"predecessor-version":[{"id":9662,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/posts\/6717\/revisions\/9662"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/media\/2019"}],"wp:attachment":[{"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/media?parent=6717"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/categories?post=6717"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/tags?post=6717"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}