{"id":6701,"date":"2024-04-20T06:44:04","date_gmt":"2024-04-20T06:44:04","guid":{"rendered":"https:\/\/www.hiclover.com\/?p=6701"},"modified":"2024-04-20T06:44:04","modified_gmt":"2024-04-20T06:44:04","slug":"hospital-incinerator-6","status":"publish","type":"post","link":"https:\/\/gofullday.com\/incineration\/hospital-incinerator-6\/","title":{"rendered":"hospital incinerator"},"content":{"rendered":"<p> NB.: Civil works and some other relevant services for the installation and training of operators must be included in the incinerator&#8217;s cost.<br \/>\n22.  Process Filtering system: Scruber to be mentionned as discretionary<br \/>\n23.<br \/>\n25.  The technical training of operators will have to be supplied and given by a technician from<br \/>\nSpecification for the shelter of the incinerator: House of the incinerator inclusive in offer (the house should have facilities for hand washing and firefighting).<br \/>\n* A timer with adjustable temporization for the regulation of each burner.<br \/>\nThis material and equipment must include in the shed of the incinerator: foundation in rubble stone, isolation roofing against humudity; elevation with brick of 20 cm (bloc cement), continuing lintel (linteau) in reinforced concrete; steel framework (charpente en metal); roofing in sheet B.C.A. 28 BG (Toiture en t?le),metal gutter, sanitary installation (wash basin, soakway pit of 20 m of depth); ash pit of 30 m3,electrical installation; concrete slab for fixing the incinerator; chanel for evacuation of rain water or waste water, wire mesh for aeration up the lintel; smooth rougtcasting of walls (interior and outside);plinth with cement; two metal doors;email paintings inside and latex paintings outside the house on walls and on doors; roofing limit (planche de rive); steps for this specification will depend on the size of the incinerator which will determine the size of the shed of this incinerator., respectively <\/p>\n<p> * A switch circuit breaker for each engine (ventilators and burners).<br \/>\n* A regulator with electronic viewing for the temperature of combustion.<br \/>\n* Electro-ventilator dispersing the secondary atmosphere, the regulation of the air flow being carried out by valves and adhering to the control of the automatic cycle.<br \/>\n* A secondary shot of air to ensure perfect oxygen content.\n<\/p>\n<p> * Burner with fuel, mono-bloc casting directing type with flat flame, lighting and safety of electronic ignition, permanent ventilation, electromagnetic sluice gate of regulation and isolating valve.<br \/>\n23.  Capacity to treat Plastic: Not less than 40% by weight<br \/>\n19.&nbsp;&nbsp; &nbsp; A control box ensuring the whole cycle of combustion.   Fan:<br \/>\n* A regulator with electronic viewing for the temperature of postcombustion.<\/p>\n<p>21. The de- ashing must be done in the bottom of the combustion chamber or the deashing should be Automatic or manual batch de ashing.<br \/>\n22. Process Filtering system : Scruber to be mentionned as optional<br \/>\n23. Emission Standards Compliance: BS 3316 or \u00e9quivalent standard<br \/>\n23. Capacity to treat Plastic: Not less than 40% by weight<br \/>\n24. CE Manufacturing Compliance: BS EN 746-2-1997<br \/>\n22.&nbsp;&nbsp; &nbsp;The supplier must give batches of spare parts of first urgency and consumable of the incinerator.<br \/>\n23.&nbsp;&nbsp; &nbsp;The installed incinerator must bear a one year guarantee.<br \/>\n24.&nbsp;&nbsp; &nbsp;The supplier shall perforn an onsite installation of the incinerator.<br \/>\n25. The technical training of operators will have to be provided and given by a technician from<br \/>\nthe factory; it will consist of curative and preventive maintenance, and the use of machine, etc<\/p>\n<p>NB.: Civil works and any other related services for the installation and training of operators must be included in the incinerator\u2019s price.<br \/>\nSpecification for the shelter of the incinerator: House of the incinerator inclusive in offer (the house must have facilities for hand washing and firefighting).<br \/>\nThis material and equipment must include in the shed of the incinerator: foundation in rubble stone, isolation roofing against humudity; elevation with brick of 20 cm (bloc cement), continuing lintel (linteau) in reinforced concrete; steel frame (charpente en metal); roofing in sheet B.C.A. 28 BG (Toiture en t?le),metal gutter, sanitary installation (wash basin, soakway pit of 20 m of depth); ash pit of 30 m3,electrical installation; concrete slab for fixing the incinerator; chanel for evacuation of rain water or waste water, wire mesh for aeration up the lintel; smooth rougtcasting of walls (interior and outside);plinth with cement; 2 metal doors ;email paintings inside and latex paintings outside the house on walls and on doors; roofing limit (planche de rive); measures for this specification will depend on the size of the incinerator which will determine the size of the shed of the incinerator., etc<\/p>\n","protected":false},"excerpt":{"rendered":"<p>NB.: Civil works and some other relevant services for the installation and training of operators must be included in the incinerator&#8217;s cost. 22. Process Filtering system: Scruber to [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":2022,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"_links":{"self":[{"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/posts\/6701"}],"collection":[{"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/comments?post=6701"}],"version-history":[{"count":1,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/posts\/6701\/revisions"}],"predecessor-version":[{"id":9464,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/posts\/6701\/revisions\/9464"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/media\/2022"}],"wp:attachment":[{"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/media?parent=6701"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/categories?post=6701"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/tags?post=6701"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}