{"id":6047,"date":"2024-04-08T06:29:41","date_gmt":"2024-04-08T06:29:41","guid":{"rendered":"https:\/\/www.hiclover.com\/?p=6047"},"modified":"2024-04-08T06:29:41","modified_gmt":"2024-04-08T06:29:41","slug":"medical-waste-incinerator-of-20-kg-hr-capacity-with-double-burner","status":"publish","type":"post","link":"https:\/\/gofullday.com\/incineration\/medical-waste-incinerator-of-20-kg-hr-capacity-with-double-burner\/","title":{"rendered":"Medical Waste Incinerator of 20 kg\/hr capacity with Double burner"},"content":{"rendered":"<p> 3 Medical Waste Incinerator of 20 kg\/hr capacity with double burner.Medical Waste Incineration Systems.  I&#8217;m interested to ruin about 200 kg stays.  A Medical Incinerator project for Tehran municipality.  Our goal for this project is to set up a plant in order to incinerate Medical waste with 50 ton\/day capacity.  A incinerator with 100 kg \/ hour burning capability.  And it should work on diesel fuel, 2 chamber.  Waste management<br \/>\nSection : environ 30&#215;30 cm<br \/>\n*Inner diameter at top 3ft 0.9m<br \/>\n*Wall 1ft high is constructed with puddle swish<br \/>\n*Filled with big stones and puddle swish to ground level<br \/>\nPuissance \u00e9lectrique : environ 2 KW<br \/>\n*Inner diameter at base 3ft 0.9m<br \/>\n*Height of Iron bars from grate above floor 1ft <\/p>\n<p> Material Required<br \/>\nEn poids : au moins 30 kg<br \/>\n*2ltrs of coal tar<br \/>\nEn volume : au moins 200 litres<br \/>\n*two empty kerosene tins for making port holes<br \/>\n*Puddle swish<br \/>\nChemin\u00e9e :<br \/>\nPost combustion : 1200\u00b0C<br \/>\n*outer diameter at base 6ft 1.8m<br \/>\n*Thickness of wall at base 18cm<br \/>\nTemp\u00e9rature :<br \/>\nCombustion : 900\u00b0C<br \/>\nHauteur (minimal ): au moins 8 m<br \/>\nCombustion : au moins 80 KW<br \/>\nIncinerator<br \/>\nPuissance des br\u00fbleurs<\/p>\n","protected":false},"excerpt":{"rendered":"<p>3 Medical Waste Incinerator of 20 kg\/hr capacity with double burner.Medical Waste Incineration Systems. I&#8217;m interested to ruin about 200 kg stays. A Medical Incinerator project for Tehran [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":2023,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"_links":{"self":[{"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/posts\/6047"}],"collection":[{"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/comments?post=6047"}],"version-history":[{"count":1,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/posts\/6047\/revisions"}],"predecessor-version":[{"id":9966,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/posts\/6047\/revisions\/9966"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/media\/2023"}],"wp:attachment":[{"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/media?parent=6047"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/categories?post=6047"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/tags?post=6047"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}