{"id":5666,"date":"2024-03-27T06:19:18","date_gmt":"2024-03-27T06:19:18","guid":{"rendered":"https:\/\/www.hiclover.com\/?p=5666"},"modified":"2024-03-27T06:19:18","modified_gmt":"2024-03-27T06:19:18","slug":"a-pyrolytic-medical-waste-incinerator-for-large-scale","status":"publish","type":"post","link":"https:\/\/gofullday.com\/incineration\/a-pyrolytic-medical-waste-incinerator-for-large-scale\/","title":{"rendered":"A PYROLYTIC MEDICAL WASTE INCINERATOR FOR LARGE SCALE"},"content":{"rendered":"<\/p>\n<p> SPECIFICATIONS OF A PYROLYTIC MEDICAL WASTE INCINERATOR FOR LARGE SCALE<\/p>\n<p> 23.\u00a0\u00a0 \u00a0 The provider must give batches of spare pieces of first urgency and consumable of the incinerator.<br \/>\n\u2022\u00a0\u00a0 \u00a0Insulate in fibrous panels : <\/p>\n<p> \u25aa\u00a0\u00a0 \u00a0.  Thickness: \u226575 mm<br \/>\n*\u00a0\u00a0 \u00a0The insulation of the combustion chamber should be composed of refractory bricks, using a high content of aluminum and insulates bricks so as to assure a minimum temperature on<br \/>\n2.\u00a0\u00a0 \u00a0<br \/>\n17.\u00a0\u00a0 \u00a0<br \/>\n\u2022\u00a0\u00a0 \u00a0Post combustion: >1100oC.<br \/>\n*\u00a0\u00a0 \u00a0Electric box.  <\/p>\n<p> 21.\u00a0\u00a0 \u00a0 The de- ashing must be completed in the base of the combustion chamber or the deashing should be Automatic or manual batch de ashing.<br \/>\n*\u00a0\u00a0 \u00a0A timer with flexible temporization for the regulation of each burner.<br \/>\n*\u00a0\u00a0 \u00a0Frontage of loading with door seals gone up on hinges, wheel of screw plug, flexible joint, and stuffing insulating out of refractory.<br \/>\n13.\u00a0\u00a0 \u00a0 The Dimension of the door for loading in cm: 120&#215;120.<br \/>\n*\u00a0\u00a0 \u00a0A device of injection of air allowing a Whole recombustion of gases,<br \/>\nLoad<br \/>\nControl box watertight to dust, such as: <\/p>\n<p> *\u00a0\u00a0 \u00a0A switch circuit breaker for each engine (ventilators and burners).<br \/>\n25.  The technical training of operators will have to be provided and given by a technician from the mill; it will include curative and preventive maintenance, and the use of machine, etc <\/p>\n<p> NB.: Civil works and any other relevant services for the installation and training of operators have to be included in the incinerator&#8217;s price.  <\/p>\n<p> 21.\u00a0\u00a0 \u00a0 Fan:<br \/>\n*\u00a0\u00a0 \u00a0Perfectly tight door for the manual loading of waste.  The loading should be Manual, Batch<br \/>\n*\u00a0\u00a0 \u00a0Plate of combustion in Carborundum, avoiding the fixing of glass and slags.  <\/p>\n","protected":false},"excerpt":{"rendered":"<p>SPECIFICATIONS OF A PYROLYTIC MEDICAL WASTE INCINERATOR FOR LARGE SCALE 23.\u00a0\u00a0 \u00a0 The provider must give batches of spare pieces of first urgency and consumable of the incinerator. [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":2023,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"_links":{"self":[{"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/posts\/5666"}],"collection":[{"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/comments?post=5666"}],"version-history":[{"count":1,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/posts\/5666\/revisions"}],"predecessor-version":[{"id":10329,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/posts\/5666\/revisions\/10329"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/media\/2023"}],"wp:attachment":[{"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/media?parent=5666"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/categories?post=5666"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/tags?post=5666"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}