{"id":5003,"date":"2024-02-21T16:08:09","date_gmt":"2024-02-21T16:08:09","guid":{"rendered":"https:\/\/www.hiclover.com\/?p=5003"},"modified":"2024-02-21T16:08:09","modified_gmt":"2024-02-21T16:08:09","slug":"china-incinerator-3","status":"publish","type":"post","link":"https:\/\/gofullday.com\/incineration\/china-incinerator-3\/","title":{"rendered":"China incinerator"},"content":{"rendered":"<\/p>\n<p>  Incinerator Of Burning Capacity 30 kg\/hr = 1 No  <\/p>\n<p>  The Incineration System Includes:  <\/p>\n<p>  I. Main Burner with  <\/p>\n<p>  A. Refractory lined Key and Additional Chamber.<\/p>\n<p>  VI.  Emergency position stack\/ vent.   <\/p>\n<p>  VII.   Cyclonic type droplet separator orgasm recirculation container in Mild steel<br \/>\nii.  1 No.  Fully automated oil burner for additional chamber.   <\/p>\n<p>  III.Centrifugal forced draft combustion air follower with electric motor.   <\/p>\n<p>  IV.  Circulation measurement tool on the Pri mary &#038; &#038; Added air ducting.   <\/p>\n<p>  V. Auto-loading in the Sort of Dual FDV mechanism with outside entrance<br \/>\nRubber lined (MSRL) building.    I.D. Follower with MSRL casing &#038; &#038; SS 316 L impeller with electric motor.   <\/p>\n<p>  X. Recirculation Pump (SS 316) with Electric engine along with piping &#038; &#038; valves in<\/p>\n<p>SS 316.   <\/p>\n<p>  XI.  Expenses HDPE Water tank for scrubber along with water piping<br \/>\nB. Refractory lined main charging door and ash cleaning door.   <\/p>\n<p>  II i. 1 No.  Fully automatic oil heater for main room.<br \/>\nin between container and scrubber.   <\/p>\n<p>  XII.  Adjoining ducting inside the battery restrictions.   <\/p>\n<p>  XIII.  Instruments, valves, dampers and fittings inside battery limitations.   <\/p>\n<p>  XIV.  PLC based Control Panel with necessary instruments.   <\/p>\n<p>  XV.  Data recording instrument in the kind of Printer.   <\/p>\n<p>  XVI.  Oil tank of 500 ltr capacity along with petroleum piping, valves &#038; &#038; strainers in between storage tank &#038; &#038; burner.   <\/p>\n<p>  XVII.  Operati ng tools &#038; &#038; tackles such as rake, hoe, shovel, 2 teeth scrapper.   <\/p>\n<p>  XVIII.  Caustic dosing system comprising Tank- Agitator as well as pump  <\/p>\n<p>  XIV.  GAS LDO DIESEL.   <\/p>\n<p> XIV. GAS LDO DIESEL. <\/p>\n","protected":false},"excerpt":{"rendered":"<p>Incinerator Of Burning Capacity 30 kg\/hr = 1 No The Incineration System Includes: I. Main Burner with A. Refractory lined Key and Additional Chamber. VI. Emergency position stack\/ [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":2013,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"_links":{"self":[{"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/posts\/5003"}],"collection":[{"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/comments?post=5003"}],"version-history":[{"count":1,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/posts\/5003\/revisions"}],"predecessor-version":[{"id":9646,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/posts\/5003\/revisions\/9646"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/media\/2013"}],"wp:attachment":[{"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/media?parent=5003"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/categories?post=5003"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/tags?post=5003"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}