{"id":5002,"date":"2025-07-21T10:25:40","date_gmt":"2025-07-21T10:25:40","guid":{"rendered":"https:\/\/www.hiclover.com\/?p=5002"},"modified":"2025-07-21T10:25:40","modified_gmt":"2025-07-21T10:25:40","slug":"maker-of-ha-zardous-waste-burner-in-china","status":"publish","type":"post","link":"https:\/\/gofullday.com\/incineration\/maker-of-ha-zardous-waste-burner-in-china\/","title":{"rendered":"Maker of ha zardous waste burner in china"},"content":{"rendered":"<\/p>\n<p>  Burning Capability: 125 kg minimum\/time (3-6times\/ day), dual chamber, dual combustion system<\/p>\n<p>  Per your advertisement for 300 kg.hr.  Version&#8211; We need to know the rate through return.   <\/p>\n<p>  The amount of Kg.  Of petrol would be required for running this Layout 10 hrs.  day-to-day.   <\/p>\n<p>  We&#8217;ve got our own Freight Forwarding Agent.   <\/p>\n<p>  We had a Contract for Rubbish Monitoring prior to their Civil Battle for 120 Tons\/Day for a single Town in North Africa.<br \/>\nMedical Waste Burner  <\/p>\n<p>  Twin Chamber (Main &#038; &#038; Secondary) with insulating material bits (completely insulated inner refractory lining) along with <\/p>\n<p>  regulated air blower for each room <\/p>\n<p>  Insulation\/ Refractory Thickness: \u2265 100mm  <\/p>\n<p>  Chamber plate thickness: \u2265 6mm  <\/p>\n<p>  Fuel Kind: Natural gas based on shedding gas in combustion chambers  <\/p>\n<p>  Waste Ability: \u2248 150 Kg\/Day  <\/p>\n<p>  Incineration capacity: \u2248 25 Kg\/Day (Different waste billing as well as waste removal doors)  <\/p>\n<p>  Burners: At least with (02) burners of automatic begin and quit functions  <\/p>\n<p>  Combustion efficiency: > > 97 percent <\/p>\n<p>  Temperature: programmable temperature with temp monitoring system  <\/p>\n<p>  Home time: 2 2nd in secondary room <\/p>\n<p>  Heating value: 4000 Kcal  <\/p>\n<p>  Temperature Level Variety: \u2248 min 800\u00baC to maximum 1200\u00baC  <\/p>\n<p>  Electrical supply: 220V with solitary stage  <\/p>\n<p>  Smokeshaft Plate Thickness: \u2265 5mm  <\/p>\n<p>  Water scrubber: Rubbing using reagent including lime &#038; &#038; should made of SS 10 gauge of non-corrosion properties and painted  <\/p>\n<p>  exteriorly by resources grade heat repellent enamel  <\/p>\n","protected":false},"excerpt":{"rendered":"<p>Burning Capability: 125 kg minimum\/time (3-6times\/ day), dual chamber, dual combustion system Per your advertisement for 300 kg.hr. Version&#8211; We need to know the rate through return. The [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":2017,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"_links":{"self":[{"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/posts\/5002"}],"collection":[{"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/comments?post=5002"}],"version-history":[{"count":1,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/posts\/5002\/revisions"}],"predecessor-version":[{"id":9351,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/posts\/5002\/revisions\/9351"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/media\/2017"}],"wp:attachment":[{"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/media?parent=5002"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/categories?post=5002"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/tags?post=5002"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}