{"id":5001,"date":"2024-04-21T16:29:56","date_gmt":"2024-04-21T16:29:56","guid":{"rendered":"https:\/\/www.hiclover.com\/?p=5001"},"modified":"2024-04-21T16:29:56","modified_gmt":"2024-04-21T16:29:56","slug":"diesel-oil-fired-medical-waste-incenerator-3","status":"publish","type":"post","link":"https:\/\/gofullday.com\/incineration\/diesel-oil-fired-medical-waste-incenerator-3\/","title":{"rendered":"diesel oil fired medical waste incenerator"},"content":{"rendered":"<p>  Heat Waste Incinerator Design D. MEGABYTES 750XL Melt Rate-150Kg\/ hr minimal Weight( Kg) -4000 kg Added Chamber  <\/p>\n<p>  (double chamber with post-burning) Gas Retention Time 2 2nd Gas Diesel Power Supply for control box 220V-240, single  <\/p>\n<p>  stage 50-60Hz Minimum working temperature level 1200 oC 1 year spare parts bundle for total maintainability 10m pipe  <\/p>\n<p>  pipeline.  1100 litre fuel Storage tank +pipeline system Containerised (the container will certainly act as housing) Additional chimney expansion  <\/p>\n<p>  1 metre high One (1) year warranty.   <\/p>\n<p>  Burner of 20 Kg: 03 Devices  <\/p>\n<p>  Electrically controlled burner.   <\/p>\n<p>  Two-compartment burner with an ability of 20 kg\/ hour.   <\/p>\n<p>  Incinerator with reduced maintenance and operating costs; Geared up with an automated control panel as well as very easy to make use of with  <\/p>\n<p>  electro-magnetic locking of the door.   <\/p>\n<p>  A primary waste reduction chamber of 900 \u00b0 C.  A blog post second burning chamber of gases generated in the primary chamber  <\/p>\n<p>  in the very least 1100 \u00b0 C.  <\/p>\n<p>  Carbon residues in ash much less than 5% by weight based on European Directive 2000\/76\/ EC.   <\/p>\n<p>  With refractory cellular lining in products of high quality<br \/>\n2\/ (CIF Term) Price of shipping from manufacturing facility to PAPUA NEW GUINEA port of LAE, Morobe province<br \/>\n3\/ Price of 2 Clover engineers to Supervise, Installation, Training our engineers and appointing the medical; waste  <\/p>\n<p>  incinerator.   <\/p>\n","protected":false},"excerpt":{"rendered":"<p>Heat Waste Incinerator Design D. MEGABYTES 750XL Melt Rate-150Kg\/ hr minimal Weight( Kg) -4000 kg Added Chamber (double chamber with post-burning) Gas Retention Time 2 2nd Gas Diesel [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":2008,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"_links":{"self":[{"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/posts\/5001"}],"collection":[{"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/comments?post=5001"}],"version-history":[{"count":1,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/posts\/5001\/revisions"}],"predecessor-version":[{"id":10222,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/posts\/5001\/revisions\/10222"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/media\/2008"}],"wp:attachment":[{"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/media?parent=5001"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/categories?post=5001"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/tags?post=5001"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}