{"id":4279,"date":"2026-03-03T10:26:30","date_gmt":"2026-03-03T10:26:30","guid":{"rendered":"https:\/\/www.hiclover.com\/?p=4279"},"modified":"2026-03-03T10:26:30","modified_gmt":"2026-03-03T10:26:30","slug":"diesel-lpg-lng-burning-vital-burning-chamber-primary-combustion-burner","status":"publish","type":"post","link":"https:\/\/gofullday.com\/incineration\/diesel-lpg-lng-burning-vital-burning-chamber-primary-combustion-burner\/","title":{"rendered":"Diesel\/LPG\/LNG burning vital burning chamber\/primary combustion burner"},"content":{"rendered":"<div class=\"topad\">\n\t\t\t\t\t\t\t\t\t\t<script async src=\"\/\/pagead2.googlesyndication.com\/pagead\/js\/adsbygoogle.js\"><\/script><\/p>\n<\/div>\n<p>  Power Supply for Control Box &#8211; &#8211; &#8211; &#8211; 220V-240V 50Hz solitary stage  <\/p>\n<p>  Minimum running temperature level 1200 \u00b0 C, please indicate.<br \/>\n1000 Litre Gas Storage Tank + Pipeline System, indicate quantity.<br \/>\nOne year Spare Elements Bundle for full maintainability.<br \/>\nGuarantee, show no of years  <\/p>\n<p>\nBurn Rate &#8211; &#8211; &#8211; &#8211; 150kg\/hour minimum.<br \/>\n2nd burning.<br \/>\nGuarantee, indicate no of years  <\/p>\n<p>  Warmth Waste Incinerator  <\/p>\n<p>  Ability at least (4000) kg\/day (( Day= 16 Working Humans Resources))  <\/p>\n<p>  Ability at the very least (4000) kg\/day (( Day= 24 Working Hrs))  <\/p>\n<p>  With the following qualities:  <\/p>\n<p>  * Automatic feeder as first part of the unit.   <\/p>\n<p>  * Automatic ash\/ leftovers removal as preliminary area of the device.   <\/p>\n<p>  * Water Injection System to handle the temperature > >  <\/p>\n<p>  * Flue gas filtering system abiding by EU.<br \/>\nGas Retention Period 2 Seconds.<br \/>\nBurn Cost 100kg\/h minimum.<br \/>\nSecond Chamber.<br \/>\nSmokeshaft with a marginal altitude of 4 meters above ground level.<br \/>\n2nd Chamber.<br \/>\nMinimum leave rate of the emissions less than 10 metres\/second.<br \/>\nIncinerator version C.<br \/>\nDiesel\/LPG\/LNG burning vital burning chamber\/primary burning region<br \/>\nChimney<br \/>\nSecond burning<br \/>\nBonus chimney expansion, suggest height.<br \/>\nWeight (kg), please indicate:.<br \/>\nChimney with a very little height of 4 meters above ground level<br \/>\nBurn Rate 250kg\/h minimal <\/p>\n<p>  Weight (kg) please showProgram.<br \/>\nGas Diesel\/LPG\/LNG, please app.\n<\/p>\n<p>  Melt Rate 65kg\/h minimal <\/p>\n<p>  Weight (kg), please show:  <\/p>\n<p>  Secondary Chamber  <\/p>\n<p>  Gas Retention Time &#8211; &#8211; &#8211; &#8211; two Secs  <\/p>\n<p>  &#8211; Fuel &#8211; Diesel\/LPG\/LNG, please reveal <\/p>\n<p>  Power Supply for Control Box &#8211; 220V-240V 50Hz solitary phase  <\/p>\n<p>  Minimum running temperature level 850 \u00b0 C, please urge <\/p>\n<p>  One year Spare Components Prepare for total maintainability  <\/p>\n<p>  10m Tube Pipe, urge size  <\/p>\n<p>  I000 Litre Gas Tank + Pipeline System, show quantity  <\/p>\n<p>  Added smokeshaft expansion, show altitude <\/p>\n<p>  Solution warranty, suggest no of years  <\/p>\n<p>  Thing 2<br \/>\nMinimum running temperature level 1200 \u00b0 C, please program  <\/p>\n<p>  One year Spare Components Prepare for full maintainability  <\/p>\n<p>  10m Tube Pipe, show size.<br \/>\nResidence time in the second room not much less than two seconds.<br \/>\nControl box that can be split as well as mounted on separate stand at least 1.5 meters from burner at about 1.6 meter  <\/p>\n<p>  elevation.<br \/>\nProduct 7.<br \/>\nControl box that can be split as well as mounted on different stand a minimum of 1.5 meters from burner at around 1.6 meter  <\/p>\n<p>  heightItem 1<br \/>\nGeneral.<br \/>\nResidence time in the second room less than 2 secs<br \/>\nDiesel\/LPG\/LNG burning primary burning chamber\/primary combustion region.<br \/>\nAssurance, show no of years  <\/p>\n<p>  Weight (kg) please show:.<br \/>\nTemperature level Cautions<\/p>\n<p>HTW Mobile Heater version G.<br \/>\n.  Minimum running temperature level 920 \u00b0 C, please urge.<br \/>\nMinimum leave velocity of the sparks very little less than 10 metres\/second<br \/>\nMobile Incinerator version F  <\/p>\n<p>  Melt Rate 100kg\/h minimal <\/p>\n<p>  Weight (kg), please indicate:  <\/p>\n<p>  Second Chamber  <\/p>\n<p>  Gas Retention Time &#8211; &#8211; &#8211; &#8211; two Secs  <\/p>\n<p>  &#8211; Fuel &#8211; Diesel\/LPG\/LNG, please suggest  <\/p>\n<p>  Power Supply for &#8211; Control Box &#8211; 220V-240V 50Hz solitary phase  <\/p>\n<p>  Minimum running temperature level 850 \u00b0 C, please suggest  <\/p>\n<p>  One year Spare Components Bundle for full maintainability  <\/p>\n<p>  10m Pipeline Pipe, suggest size  <\/p>\n<p>  1000 Litre Gas Container + Pipe System, show amount  <\/p>\n<p>  Additional smokeshaft expansion, show altitude <\/p>\n<p>  Service warranty, indicate no of years.<br \/>\nSmokeshaft.<br \/>\nBoth essential along with the second temperature levels maintained up until all the waste has actually been entirely stired up<br \/>\nFuel Diesel\/LPG\/LNG, please show.{<br \/>\n(adsbygoogle = window.adsbygoogle || []).push({});|}<br \/>\nMobile Heater version E  <\/p>\n<p>  Melt Cost 50kg\/h minimal <\/p>\n<p>  Weight (kg), please program:  <\/p>\n<p>  Second Chamber  <\/p>\n<p>  Gas Retention Time &#8211; &#8211; &#8211; &#8211; 2 Seconds &#8211;  <\/p>\n<p>  &#8211; Gas &#8211; Diesel\/LPG\/LNG, please suggest  <\/p>\n<p>  Power Supply for Control Box &#8211; 220V-240V 50Hz solitary stage  <\/p>\n<p>  Minimum running temperature degree 850 \u00b0 C, please suggest  <\/p>\n<p>  One year Spare Elements Package for complete maintainability.<br \/>\nService warranty, indicate no of years  <\/p>\n<p>  Warmth Waste Burner  <\/p>\n<p>  Ability at the very least (4000) kg\/day (( Day= 16 Functioning Hrs))  <\/p>\n<p>  Ability at the very least (4000) kg\/day (( Day= 24 Working Hrs))  <\/p>\n<p>  With the complying with qualities:  <\/p>\n<p>  * Automatic feeder as initial component of the device.   <\/p>\n<p>  * Automatic ash\/ leftovers elimination as preliminary element of this system.   <\/p>\n<p>  * Water Injection System to control the temperature level > >  <\/p>\n<p>  * Flue gas filtering system after by EU.   <\/p>\n<p>  * Consistent discharge monitoring as well as recording system.  <\/p>\n<p>  elevation.<br \/>\nBonus smokeshaft expansion, suggest elevation.<br \/>\nBoth primary and the further temperature amounts protected up until all of the waste has been totally ignited.<br \/>\nSecondary Chamber.<br \/>\nAudible and\/or noticeable alarm to encourage the driver when the additional temperature goes down to listed below the called for temperature level.{<br \/>\n(adsbygoogle = window.adsbygoogle || []).push({});|}<br \/>\nI000 Litre Gas Tank + Pipe System, indicate amount.|1000 Litre Gas Storage Tank + Pipeline System, indicate quantity.\n<\/p>\n<p>  Weight (kg) please showProgram.<br \/>\nSecond burning<br \/>\nAudible and\/or noticeable alarm to encourage the driver when the additional temperature goes down to listed below the called for temperature level.<br \/>\nSmokeshaft with a marginal altitude of 4 meters above ground level.<\/p>\n<p>2nd burning.<br \/>\nBoth essential along with the second temperature levels maintained up until all the waste has actually been entirely stired up<br \/>\nGeneral<br \/>\nChimney<br \/>\nBoth primary and the further temperature amounts protected up until all of the waste has been totally ignited.<br \/>\nMinimum running temperature level 1200 \u00b0 C, please program  <\/p>\n<div class=\"bottomad\">\n\t\t\t\t\t\t\t\t\t\t<script async src=\"\/\/pagead2.googlesyndication.com\/pagead\/js\/adsbygoogle.js\"><\/script><\/p>\n<p>  One year Spare Components Prepare for full maintainability  <\/p><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Power Supply for Control Box &#8211; &#8211; &#8211; &#8211; 220V-240V 50Hz solitary stage Minimum running temperature level 1200 \u00b0 C, please indicate. 1000 Litre Gas Storage Tank + [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":2012,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"_links":{"self":[{"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/posts\/4279"}],"collection":[{"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/comments?post=4279"}],"version-history":[{"count":1,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/posts\/4279\/revisions"}],"predecessor-version":[{"id":9975,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/posts\/4279\/revisions\/9975"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/media\/2012"}],"wp:attachment":[{"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/media?parent=4279"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/categories?post=4279"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/tags?post=4279"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}