{"id":3820,"date":"2024-04-06T06:41:18","date_gmt":"2024-04-06T06:41:18","guid":{"rendered":"https:\/\/www.hiclover.com\/?p=3820"},"modified":"2024-04-06T06:41:18","modified_gmt":"2024-04-06T06:41:18","slug":"medical-waste-incinerators-china","status":"publish","type":"post","link":"https:\/\/gofullday.com\/incineration\/medical-waste-incinerators-china\/","title":{"rendered":"medical waste incinerators china"},"content":{"rendered":"<ol start=\"4\">\n<li>Ensure flame contact with all gases is achieved. &#8211;yes<\/li>\n<li>Ensure residence time is not less than two (2) seconds. &#8211;yes<\/li>\n<li>Ensure the gas temperature as measured against the inside wall in the secondary chamber &amp; not in the flame<\/li>\n<\/ol>\n<p> zone, is less than 1100oC. &#8211;1000-1200 oC <\/p>\n<p> &nbsp; <\/p>\n<ol start=\"7\">\n<li>Ensure the oxygen content of the emitted gases is not less than 11%.&#8211;yes<\/li>\n<li>Ensure both primary and the combustion temperatures are maintained until all waste has been completely<\/li>\n<\/ol>\n<p> combusted&#8211;yes <\/p>\n<p> &nbsp; <\/p>\n<p> 5\u00a0\u00a0\u00a0\u00a0 Particulate Removers A mechanical particulate collector has to be integrated after secondary combustion <\/p>\n<p> chamber for removal of particulate pollutants entrained in the flue gas stream.  The particulate collectors may comprise <\/p>\n<p> some of the following or a combination thereof: <\/p>\n<p> &nbsp; <\/p>\n<p> Cyclone separator <\/p>\n<p> Electrostatic precipitators <\/p>\n<p> Fabric filters&#8212; filter brick <\/p>\n<p> 6\u00a0\u00a0\u00a0\u00a0 Chimney \/ Stack\u00a0 1.\u00a0\u00a0\u00a0   The topography and height of adjacent buildings <\/p>\n<p> within 50 meters radius should be taken into consideration. &#8211;6 meter already, can plus 4 meters, free cost <\/p>\n<p> &nbsp; <\/p>\n<p> unacceptable.  <\/p>\n<ol start=\"2\">\n<li>If possible the chimney should be visible to the operator from the feeding area.\u2014according to local site<\/li>\n<li>The addition of dilution air after combustion in order to achieve the requirement of these guidelines is<\/li>\n<\/ol>\n<p> &nbsp; <\/p>\n<p> wind speed x 2) whichever is higher to ensure no down washing of leaving gases.  . &#8211;yes <\/p>\n<ol start=\"4\">\n<li>The minimum exit velocity should be 10 m\/s and at least twice the surrounding wind speed (Efflux velocity =<\/li>\n<\/ol>\n<p> &nbsp; <\/p>\n<p> &nbsp; <\/p>\n<p> &nbsp; <\/p>\n<ol start=\"5\">\n<li>Point for the measurement of emissions shall be provided. .&#8211;yes<\/li>\n<\/ol>\n<p> &nbsp; <\/p>\n<p> 7\u00a0\u00a0\u00a0\u00a0 Instrumentation\u00a0\u00a0 Instrument for determining the inside wall temperature and not burner flame temperature has to be <\/p>\n<p> provided for both primary and secondary chambers. &#8211;yes <\/p>\n<p> &nbsp; <\/p>\n<p> below the required temperature.  <\/p>\n<ol start=\"2\">\n<li>An audible and visible alarm must be installed to warn the operator when the secondary temperature drops to<\/li>\n<\/ol>\n<p> Capacity\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Not less than 500Kg\/hr.  <\/p>\n<p> Operation\u00a0\u00a0\u00a0\u00a0 24hr-7days\/week continuous operation.  <\/p>\n<p> Combustion chamber 2 combustion chamber.  <\/p>\n<p> Temp.\u00a0\u00a0\u00a0  First combustion chamber 800-1000 C. <\/p>\n<p> Secandry combustion chamber 1000-1200 C, with the possibility to be updated to 1400 <\/p>\n<p>Secandry combustion chamber 1000-1200 C, with the possibility to be upgraded to 1400<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Ensure flame contact with all gases is achieved. &#8211;yes Ensure residence time is not less than two (2) seconds. &#8211;yes Ensure the gas temperature as measured against the [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":2018,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"_links":{"self":[{"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/posts\/3820"}],"collection":[{"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/comments?post=3820"}],"version-history":[{"count":1,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/posts\/3820\/revisions"}],"predecessor-version":[{"id":9671,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/posts\/3820\/revisions\/9671"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/media\/2018"}],"wp:attachment":[{"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/media?parent=3820"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/categories?post=3820"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/tags?post=3820"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}