{"id":3819,"date":"2024-04-20T05:09:00","date_gmt":"2024-04-20T05:09:00","guid":{"rendered":"https:\/\/www.hiclover.com\/?p=3819"},"modified":"2024-04-20T05:09:00","modified_gmt":"2024-04-20T05:09:00","slug":"incineration-in-china","status":"publish","type":"post","link":"https:\/\/gofullday.com\/incineration\/incineration-in-china\/","title":{"rendered":"incineration in china"},"content":{"rendered":"<p> Combustion Efficiency\u00a0\u00a0\u00a0\u00a0 99.99percent <\/p>\n<p> Retention time\u00a0\u00a0\u00a0 Of the flow pollutants less than 2 Sec in the hot part.  <\/p>\n<p> Excess Oxygen concentration\u00a0 Of primary combustion chamber 3-6% max.  <\/p>\n<p> Refractory\u00a0\u00a0\u00a0 The chambers should be lined with high thermal insulating refractory bricks with appropriate thickness and <\/p>\n<p> with exceptionally temp.  resistance.  Less than 1400 C for the first combustion chamber, and not less than 1600 C to the <\/p>\n<p> secandry combustion chamber, and at exactly the same time prevent the Temp.  Of the exterior body of the room not higher than <\/p>\n<p> 70 C. <\/p>\n<p> Doors\u00a0\u00a0\u00a0 Should be lined with the same bricks, and the edges lined with special suitable insulating material to prevent <\/p>\n<p> any gas escaping, and the doors should be kept under negative pressure during the operation.   Less than 99.9999 as per KEPA.  <\/p>\n<p> Wet System\u00a0 If the machine equiped with a CEMS washing the flow gasoline with water, then it should be made from <\/p>\n<p> appropriate anti corrossion materials, and equiped with pH meter to measure and neutralize the water.  It needs to be able to <\/p>\n<p> use the water in closed recycled circuit many times before treating\/ discharging into the sewage system in accordance <\/p>\n<p> with KEPARS.   <\/p>\n<p> Chimney\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 It should be appropriate with the capacity and the technical specifications, with height less than 12m from <\/p>\n<p> ground level.  With simple opennable sampling point equal about 3 inch, and the optimum sampling locations is at least 8D <\/p>\n<p> downstream direction and 2D upstream from any flow disturbancies.  <\/p>\n<p> Sampling point\u00a0\u00a0\u00a0 Should be equiped with a platform situated down the sampling point by a distance less than 1 m, and <\/p>\n<p> equiped with appropriate stairs from ground to the vent with comfortable slope.  <\/p>\n<p> Ash Removal\u00a0\u00a0\u00a0\u00a0\u00a0 It should be auto ash removal system.  <\/p>\n<p> Fuel\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 It should be double system, such as gas and natural gas.  <\/p>\n<p> Feeding System\u00a0 Should be auto feeding system into primary chamber.  <\/p>\n<p> Control Room\u00a0\u00a0\u00a0\u00a0 Should be equiped with a control panel displays Temp.  Of the combustion burners, gas monitoring, digital <\/p>\n<p> Temp.  Indecation for the primary\/secondary chambers, digital Temp.  Indication for the gases&#8230;etc. it should be also <\/p>\n<p> Auto operation, burnures on\/off automobile lamps change, auto start\/stop for air emission control system, automobile gas constant <\/p>\n<p> monitoring system reading and print from gas emission parameters&#8230;etc..  <\/p>\n<p> Cooling System\u00a0\u00a0 The primary chamber should be provided with automobile cooling systemthrough nozzles to permit direct cooling <\/p>\n<p> if the Temp.   Less than 500 C. <\/p>\n<p> Flue cleaning and treatment To include a joint system (wet\/dry), using water, lime, active carbon and ceramic <\/p>\n<p> filters.  <\/p>\n<p> Quenching system\/Heat exchanger Should be made and manufactured from anti rust and acid attack materials like <\/p>\n<p> stainless steel 316 or equivalent.  <\/p>\n<p> Noise Level\u00a0 Not more than 85 dBA during regular operation.  <\/p>\n<p> Inaddition\u00a0\u00a0\u00a0 The desigh should insure that reactive fail-safe control systems are utilized.  <\/p>\n<p> The incinerator should be installed inside closed appropriate building with good aeration and ventilation system.  <\/p>\n<p> The building has facilities for off-loading of wastes from transport vehicles.  Auto cleaning system for trucks and <\/p>\n<p> waste containers, and cool storage area&#8230;etc..  <\/p>\n<p> The quotation should included list of original spare parts for 7 years.  <\/p>\n<p> The quotation should include supervising, beginning and training of the operators and ministry of health <\/p>\n<p> engineers inside\/outside Kuwait.  <\/p>\n<p> Detailed drawings, catalogs should be included.Our normal activities creates 2-5 tons of assorted waste <\/p>\n<p> materials daily which range from condemned carcasses, and other wastes all that need to be incinerated\u00a0 at above <\/p>\n<p> 800Centigrade measured\u00a0 flue exhaust gas.  <\/p>\n<p>The quotation should include supervising, starting up and training of the operators and ministry of health<\/p>\n<p>engineers inside\/outside Kuwait.<\/p>\n<p>Detailed drawings, catalogs should be included.Our normal activities generates\u00a0 2-5 tons of assorted waste<\/p>\n<p>materials per day which range from condemned carcasses, and other wastes all which need to be incinerated\u00a0 at above<\/p>\n<p>800Centigrade measured\u00a0 flue exhaust gas.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Combustion Efficiency\u00a0\u00a0\u00a0\u00a0 99.99percent Retention time\u00a0\u00a0\u00a0 Of the flow pollutants less than 2 Sec in the hot part. Excess Oxygen concentration\u00a0 Of primary combustion chamber 3-6% max. Refractory\u00a0\u00a0\u00a0 The [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":2006,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"_links":{"self":[{"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/posts\/3819"}],"collection":[{"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/comments?post=3819"}],"version-history":[{"count":1,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/posts\/3819\/revisions"}],"predecessor-version":[{"id":10014,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/posts\/3819\/revisions\/10014"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/media\/2006"}],"wp:attachment":[{"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/media?parent=3819"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/categories?post=3819"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/tags?post=3819"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}