{"id":3807,"date":"2024-04-24T09:52:59","date_gmt":"2024-04-24T09:52:59","guid":{"rendered":"https:\/\/www.hiclover.com\/?p=3807"},"modified":"2024-04-24T09:52:59","modified_gmt":"2024-04-24T09:52:59","slug":"20kgs-per-hour-incinerator","status":"publish","type":"post","link":"https:\/\/gofullday.com\/incineration\/20kgs-per-hour-incinerator\/","title":{"rendered":"20kgs per hour incinerator"},"content":{"rendered":"<p> \uf0b7The manufacturer must provide a declaration that the pressure vessel is manufactured in compliance with relevant <\/p>\n<p> guidelines for pressure equipment.  <\/p>\n<p> &nbsp; <\/p>\n<p> Following accompanying documents should be provided with the treatment system and shall be available at the Site: <\/p>\n<p> &nbsp; <\/p>\n<p> 1. Operation instructions (like process description).  <\/p>\n<p> 2. Loading and maintenance processes.  <\/p>\n<p> 3.Short-form of loading and operation procedures.  <\/p>\n<p> 4. P&#038;I diagram, circuit plan, technical data sheet, pressure vessel certification.  <\/p>\n<p> &nbsp; <\/p>\n<p> A3) Technical Specification: Medical Waste Shredder <\/p>\n<p> &nbsp; <\/p>\n<p> \uf0b7Ability: Should be 150 liters.  <\/p>\n<p> &nbsp; <\/p>\n<p> \uf0b7ought to be able to shred up to 100 liters of the treated waste.  <\/p>\n<p> &nbsp; <\/p>\n<p> &nbsp; <\/p>\n<p> &nbsp; <\/p>\n<p> \uf0b7The technology should be capable to deal with hospital waste including sharps like needles, lancets, scalpels and soft <\/p>\n<p> materials like bandages.  <\/p>\n<p> &nbsp; <\/p>\n<p> \uf0b7Must leave the waste to be unrecognizable.  <\/p>\n<p> &nbsp; <\/p>\n<p> Following accompanying documents must be provided with the treatment system and shall be available at the Site: <\/p>\n<p> &nbsp; <\/p>\n<p> 1. Operation instructions (like process description.  <\/p>\n<p> 2. Loading and maintenance processes.  <\/p>\n<p> &nbsp; <\/p>\n<p> 3.Short-form of loading and operation procedures.  <\/p>\n<p> &nbsp; <\/p>\n<p> &nbsp; <\/p>\n<ol>\n<li>Deliverables:<\/li>\n<\/ol>\n<p> &nbsp; <\/p>\n<p> The Bidder will be responsible to deliver and set up all the components to be provided with the equipments in the waste <\/p>\n<p> handling area at destination hospital(s) in the Republic of Kenya.  The Bidder shall deliver a time program before <\/p>\n<p> and during the complete construction and assembling period.  <\/p>\n<p> &nbsp; <\/p>\n<p> ACCOMPANYING DOCUMENTS <\/p>\n<p> &nbsp; <\/p>\n<p> The following accompanying documents must be provided with EACH of the delivered incinerators: <\/p>\n<p> &nbsp; <\/p>\n<p> 1. Two (2) full performance instruction manuals (including process description; loading and maintenance procedures) in the <\/p>\n<p> English language.  <\/p>\n<p> &nbsp; <\/p>\n<p> 2. Three (3) short-form documents of loading and operation processes (English Language).   Circuit and pneumatic plan, technical data sheet, pressure vessel certification (English Language).  <\/p>\n<p> &nbsp; <\/p>\n<p> 4. One set of security regulations (English language).  <\/p>\n<p> &nbsp; <\/p>\n<p> 5. Set of necessary safety signs.  <\/p>\n<p> &nbsp; <\/p>\n<p> All documents must also be supplied on CD (one CD per treatment system) in digital form in the English language.  <\/p>\n<p>&nbsp;<\/p>\n<p>All documents must also be provided on CD (one CD per treatment system) in digital form in the English language.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>\uf0b7The manufacturer must provide a declaration that the pressure vessel is manufactured in compliance with relevant guidelines for pressure equipment. &nbsp; Following accompanying documents should be provided with [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":2013,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"_links":{"self":[{"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/posts\/3807"}],"collection":[{"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/comments?post=3807"}],"version-history":[{"count":1,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/posts\/3807\/revisions"}],"predecessor-version":[{"id":10406,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/posts\/3807\/revisions\/10406"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/media\/2013"}],"wp:attachment":[{"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/media?parent=3807"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/categories?post=3807"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/tags?post=3807"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}