{"id":3802,"date":"2024-04-01T11:36:03","date_gmt":"2024-04-01T11:36:03","guid":{"rendered":"https:\/\/www.hiclover.com\/?p=3802"},"modified":"2024-04-01T11:36:03","modified_gmt":"2024-04-01T11:36:03","slug":"waste-incinerator-manufacturers-china-2","status":"publish","type":"post","link":"https:\/\/gofullday.com\/incineration\/waste-incinerator-manufacturers-china-2\/","title":{"rendered":"waste incinerator manufacturers china"},"content":{"rendered":"<p> 5-1- Chambre de post combustion est install\u00e9e au dessus du foyer\u00a0 de combustion, elle\u00a0 est constitu\u00e9e d&#8217;un <\/p>\n<p> cylindre\u00a0 m\u00e9tallique\u00a0 rev\u00eatu int\u00e9rieurement d&#8217;une couche d&#8217; isolant et d&#8217;une couche de mat\u00e9riaux r\u00e9fractaires.   : 2,1 m3 <\/p>\n<p> Est dimensionn\u00e9e pour pouvoir\u00a0 garantir\u00a0 un temps de fum\u00e9e de 2 secondes \u00e0 1100\u00b0C avec un pourcentage d&#8217;oxyg\u00e8ne libre <\/p>\n<p> d&#8217;au moins 6%.  <\/p>\n<p> 5-3 -Accessoires <\/p>\n<p> ? Trappe de visite boulonn\u00e9e frontal pour permettre l&#8217;inspection p\u00e9riodique <\/p>\n<p>? La liaison \u00e0 la chambre de combustion est tapiss\u00e9e de r\u00e9fractaire <\/p>\n<p>? Setup les br?leurs <\/p>\n<p>?   Tuyauteries\u00a0 de distribution d&#8217;air <\/p>\n<p> ?  Soupape de r\u00e9gulation de l&#8217;air souffl\u00e9\u00a0 asservi par la sonde du d\u00e9bit\u00a0 d&#8217; oxyg\u00e8ne <\/p>\n<ol start=\"6\">\n<li>PRODUCTION DE L\u2019AIR COMBURANT DE LA CHAMBRE DE POST COMBUSTION<\/li>\n<\/ol>\n<p> &nbsp; <\/p>\n<p> Sont pr\u00e9vus two br?leurs du type \u00e0 l&#8217;air souffl\u00e9 au gasoil \u00e9quip\u00e9s\u00a0 des dispositifs de s\u00e9curit\u00e9.  <\/p>\n<p> A la mise en route du four les deux\u00a0 br?leurs sont\u00a0 allum\u00e9s pour assurer la temp\u00e9rature minimale d&#8217;au moins 1100\u00b0C? ; <\/p>\n<p> ils restent en marche successivement\u00a0 pour maintenir la temp\u00e9rature constante.  <\/p>\n<p> Puissance thermique install\u00e9e (290 + 350) KW.  <\/p>\n<ol start=\"7\">\n<li>BRULEUR DE LA CHAMBRE DE POST COMBUSTION<\/li>\n<\/ol>\n<p> &nbsp; <\/p>\n<p> Constitu\u00e9 par un conduit m\u00e9tallique vertical de 8 m de long install\u00e9e au-dessus de la\u00a0 chambre de PC, diam\u00e8tre 630 millimeter <\/p>\n<p> en t?le d&#8217;acier au carbone avec garnissage int\u00e9rieur en r\u00e9fractaire <\/p>\n<p> &nbsp; <\/p>\n<p> Compos\u00e9e\u00a0 de? : <\/p>\n<ol start=\"8\">\n<li>CHEMINEE D\u2019EVACUATION<\/li>\n<\/ol>\n<p> ? Circuit\u00a0 380 V- 50 HZ-3 phases <\/p>\n<p>? Voyant sous tension <\/p>\n<p> ? Commande d&#8217;arr\u00eat\u00a0 g\u00e9n\u00e9ral <\/p>\n<ol start=\"9\">\n<li>ARMOIRE ELECTRIQUE DE COMMANDE ET REGULATION<\/li>\n<\/ol>\n<p> ? Voyant \u00e9tat des bruleurs <\/p>\n<p> ? Affichage des\u00a0 temp\u00e9ratures\u00a0 des deux chambres <\/p>\n<p> ? Minuterie des temps des cycles.  <\/p>\n<p> ? Une variation des vitesses des ventilateurs <\/p>\n<p> ? Le tableau et les cablages sont pr\u00e9vus aux r\u00e8gles CEI avec protection IP 55 <\/p>\n<p> ? Microprocesseur pour le contr?le et la r\u00e9gulation des temp\u00e9ratures, ainsi que les cycles d&#8217;op\u00e9ration <\/p>\n<p> ? Cablages r\u00e9alis\u00e9s selon les r\u00e8gles CEI.  <\/p>\n<p> &nbsp; <\/p>\n<p> Les\u00a0 dispositifs suivants\u00a0 sont pr\u00e9vus? : <\/p>\n<p> 1)Thermocouples pour la mesure de la temp\u00e9rature\u00a0 en chambre de combustion?  et postcombustion, \u00e0 la sortie de <\/p>\n<p> l&#8217;\u00e9changeur dans la section d&#8217;entr\u00e9e du filtre <\/p>\n<p> 2)Syst\u00e8me de mesure de la concentration d&#8217;oxyg\u00e8ne dans les fum\u00e9es humides a la sortie de la chambre de postcombustion <\/p>\n<ol start=\"10\">\n<li>INSTRUMENTATION DE CONTROLE ET DE MESURAGE CONTINU<\/li>\n<\/ol>\n<p> constitu\u00e9 de? : <\/p>\n<p> ? Sonde de mesure de l&#8217;oxyg\u00e8ne \u00e0 l&#8217;oxyde de zirconium <\/p>\n<p>? Pompe \u00e0 la membrane <\/p>\n<p> ? D\u00e9bitm\u00e8tre <\/p>\n<p> &nbsp; <\/p>\n<p> An Incinerator is to be given by the Contractor on a rental basis at a location established by the Company.  The <\/p>\n<p> Contractor is to provide trained and capable personnel with initial installation, commissioning and operational <\/p>\n<p> training under the supervision of the manufacturer&#8217;s technician.  The incinerator is to be maintained and managed to <\/p>\n<p> manufacturer&#8217;s specifications by trained personnel.  Contractor must have sufficient staff trained and able to <\/p>\n<p> operate the incinerator during the contract period.  Specifications for the incinerator are attached in Appendix A. <\/p>\n<p>Contractor is to provide trained and competent personnel with initial installation, commissioning and operational<\/p>\n<p>training under the supervision of the manufacturer\u2019s technician. The incinerator is to be maintained and operated to<\/p>\n<p>manufacturer\u2019s specifications by trained personnel. Contractor must have sufficient personnel trained and competent to<\/p>\n<p>operate the incinerator throughout the contract period. Specifications for the incinerator are attached in Appendix A.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>5-1- Chambre de post combustion est install\u00e9e au dessus du foyer\u00a0 de combustion, elle\u00a0 est constitu\u00e9e d&#8217;un cylindre\u00a0 m\u00e9tallique\u00a0 rev\u00eatu int\u00e9rieurement d&#8217;une couche d&#8217; isolant et d&#8217;une couche [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":2011,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"_links":{"self":[{"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/posts\/3802"}],"collection":[{"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/comments?post=3802"}],"version-history":[{"count":1,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/posts\/3802\/revisions"}],"predecessor-version":[{"id":10131,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/posts\/3802\/revisions\/10131"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/media\/2011"}],"wp:attachment":[{"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/media?parent=3802"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/categories?post=3802"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/tags?post=3802"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}