{"id":3798,"date":"2024-05-21T11:08:46","date_gmt":"2024-05-21T11:08:46","guid":{"rendered":"https:\/\/www.hiclover.com\/?p=3798"},"modified":"2024-05-21T11:08:46","modified_gmt":"2024-05-21T11:08:46","slug":"medical-incinerator-design","status":"publish","type":"post","link":"https:\/\/gofullday.com\/incineration\/medical-incinerator-design\/","title":{"rendered":"medical incinerator design"},"content":{"rendered":"<p> It&#8217;s anticipated that the Bidder will cooperate closely with PATH and target Hospitals for the new waste management <\/p>\n<p> building\/area and will make available all needed technical information, drawings, etc., <\/p>\n<p> &nbsp; <\/p>\n<p> The following waste streams shall be treated in the new HCW treatment center(s): <\/p>\n<p> &nbsp; <\/p>\n<p> \uf0b7Infectious waste <\/p>\n<p> &nbsp; <\/p>\n<p> \uf0b7Sharps waste <\/p>\n<p> &nbsp; <\/p>\n<p> \uf0b7Pathological waste <\/p>\n<p> &nbsp; <\/p>\n<p> \uf0b7Pharmaceutical waste including cytotoxic or genotoxic waste <\/p>\n<p> &nbsp; <\/p>\n<p> \uf0b7Small amounts of chemical waste <\/p>\n<p> TECHNICAL SPECIFICATION FOR PROCUREMENT OF&#8221;MEDICAL WASTE TREATMENT PLANT&#8221; <\/p>\n<p> Lot-A <\/p>\n<p> Specification <\/p>\n<p> 1. Hydroclave for Medical waste Treatment Plant: Quantity: 02 Nos.  <\/p>\n<p> General Requirements <\/p>\n<p> \uf0b7The chip must be accepted to purge &#038; treat the following types of medical waste: <\/p>\n<p> -Liquids: Blood, body fluids .  <\/p>\n<p> -Blood bags &#038; tubing, gloves, Gowns, drapes, etc..   <\/p>\n<p> -Sharps &#038; Sharp containers <\/p>\n<p> -Disposable instruments <\/p>\n<p> -Glass products <\/p>\n<p> -Human and animal tissue (surgical and pathologic) &#8211;Based upon MWM regulations <\/p>\n<p> -Cultures, stocks and glassware <\/p>\n<p> \uf0b7The chip must comply with a documented efficacy level of 6log10 decrease in spore survival (99,9999%) of the <\/p>\n<p> Bacillus Stearothermophilus <\/p>\n<p> \uf0b7The chip should reduce the volume of the waste by 60% to 80% through complete dehydration and sterilization of <\/p>\n<p> the waste <\/p>\n<p> \uf0b7The\u00a0 chip must have ZERO harmful emission level and meet or exceed all criteria required by the EU.  <\/p>\n<p> The whole waste treatment system should be offered as a complete unit consisting of following equipment and <\/p>\n<p> ancillaries- <\/p>\n<p> (A)The sterilization processing unit <\/p>\n<p> (B)Steam Boiler <\/p>\n<p> (C)Tub washer <\/p>\n<p> (D)Heavy duty external shredder- <\/p>\n<p> (E)Conveyer belt-based on Manufacturer&#8217;s Recommendations <\/p>\n<p> (F)Bin Lift\/Tipper <\/p>\n<p> (G)Spore tester <\/p>\n<p> (A)Features and Specifications of the Sterilization Processor unit: <\/p>\n<p> Technical specification of the chip: <\/p>\n<p> \uf0b7Steam autoclave in combination with a heavy duty Fragmenting System within the vessel\/chamber <\/p>\n<p> \uf0b7The boat must be of Double Chamber <\/p>\n<p> \uf0b7Ability (kg\/load): minimum 200 kg\/batch\/cycle <\/p>\n<p> \uf0b7Volume of 140-190 liters of bulk per cycle <\/p>\n<p> \uf0b7Average Cycle time: 60 minutes <\/p>\n<p> \uf0b7Operating temperature: 121\u25e6C to 135\u25e6C <\/p>\n<p> \uf0b7Running pressure: 1.1 Bar to 2.4 Bar <\/p>\n<p>\uf0b7Operating pressure : 1.1 Bar to 2.4 Bar<\/p>\n","protected":false},"excerpt":{"rendered":"<p>It&#8217;s anticipated that the Bidder will cooperate closely with PATH and target Hospitals for the new waste management building\/area and will make available all needed technical information, drawings, [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":2019,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"_links":{"self":[{"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/posts\/3798"}],"collection":[{"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/comments?post=3798"}],"version-history":[{"count":1,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/posts\/3798\/revisions"}],"predecessor-version":[{"id":10011,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/posts\/3798\/revisions\/10011"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/media\/2019"}],"wp:attachment":[{"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/media?parent=3798"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/categories?post=3798"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/tags?post=3798"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}