{"id":3781,"date":"2024-04-19T03:48:13","date_gmt":"2024-04-19T03:48:13","guid":{"rendered":"https:\/\/www.hiclover.com\/?p=3781"},"modified":"2024-04-19T03:48:13","modified_gmt":"2024-04-19T03:48:13","slug":"smart-ash-incinerator-price","status":"publish","type":"post","link":"https:\/\/gofullday.com\/incineration\/smart-ash-incinerator-price\/","title":{"rendered":"smart ash incinerator price"},"content":{"rendered":"<\/p>\n<p> Flue Gas Cleaning <\/p>\n<p> &nbsp; <\/p>\n<p> System <\/p>\n<p> &nbsp; <\/p>\n<p> ? <\/p>\n<p> &nbsp; <\/p>\n<p> quoted individually ) <\/p>\n<p> &nbsp; <\/p>\n<p> &nbsp; <\/p>\n<p> 7 Chimney Height 10m (minimal ) <\/p>\n<p> &nbsp; <\/p>\n<p> &nbsp; <\/p>\n<p> &nbsp; <\/p>\n<p>?\u00a0\u00a0\u00a0\u00a0  Overall duration of the supervision of installation, testing and commissioning works shall not exceed 2 weeks.  <\/p>\n<p> &nbsp; <\/p>\n<p> &nbsp; <\/p>\n<p> 2.11\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Commissioning <\/p>\n<p> &nbsp; <\/p>\n<p> &nbsp; <\/p>\n<p> Commissioning\u00a0 tests\u00a0 to\u00a0 be\u00a0 performed on\u00a0 site\u00a0 shall\u00a0 include\u00a0 but\u00a0 not\u00a0 limited\u00a0 to\u00a0 the next.  <\/p>\n<p> &nbsp; <\/p>\n<p> &nbsp; <\/p>\n<p> ?\u00a0\u00a0\u00a0\u00a0  Capacity evaluation with respect to guaranteed particulars <\/p>\n<p>?\u00a0\u00a0\u00a0\u00a0  Emission test with respect to limits set in annex 1.  Note that bidder shall provide its own evaluation kit for <\/p>\n<p> carrying out the emission tests.  <\/p>\n<p> ?\u00a0\u00a0\u00a0\u00a0  Flame safeguard.  The performance of the flame safeguard system should be verified by causing fire and\u00a0 ignition <\/p>\n<p> failures.\u00a0  Operation of\u00a0 the audible alarm (where applicable) and observable indicator should be verified.  The shutdown <\/p>\n<p> times should be verified.  <\/p>\n<p> ?\u00a0\u00a0\u00a0\u00a0  Testing of all shutdowns to the system.  <\/p>\n<p> ?\u00a0\u00a0\u00a0\u00a0  All interlocks provided should be tested for proper operation as specified by the device manufacturer.  <\/p>\n<p> ?\u00a0\u00a0\u00a0\u00a0  Combustion controls.  The gas controls should be stable and function <\/p>\n<p> &#8211; For some applications requiring rotary kiln incinerators but narrow; <\/p>\n<p> &nbsp; <\/p>\n<p> &#8211; For hospital; incinerators requiring gas as LPG, diesel or heavy fuel oil: This market segment, my firm have been <\/p>\n<p> had group clients to provide the equipment for more 5 years.  <\/p>\n<p> &nbsp; <\/p>\n<p> &#8211; Notably, the incinerator &#8211; model series (No auxiliary fuel is required): Those products are feasible to earnings <\/p>\n<p> hundreds and thousand over the Vietnamese market in case of your products possessed the optimal technical specifications <\/p>\n<p> and reasonable price.  Those products are starting and suitable solution for combusting solid waste in Vietnamese <\/p>\n<p> market which I have already promote research and testing.  <\/p>\n<p>market which I have already market research and testing.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Flue Gas Cleaning &nbsp; System &nbsp; ? &nbsp; quoted individually ) &nbsp; &nbsp; 7 Chimney Height 10m (minimal ) &nbsp; &nbsp; &nbsp; ?\u00a0\u00a0\u00a0\u00a0 Overall duration of the supervision [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":2017,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"_links":{"self":[{"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/posts\/3781"}],"collection":[{"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/comments?post=3781"}],"version-history":[{"count":1,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/posts\/3781\/revisions"}],"predecessor-version":[{"id":9496,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/posts\/3781\/revisions\/9496"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/media\/2017"}],"wp:attachment":[{"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/media?parent=3781"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/categories?post=3781"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/tags?post=3781"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}