{"id":3364,"date":"2024-04-25T23:12:09","date_gmt":"2024-04-25T23:12:09","guid":{"rendered":"https:\/\/www.hiclover.com\/?p=3364"},"modified":"2024-04-25T23:12:09","modified_gmt":"2024-04-25T23:12:09","slug":"domestic-incinerator","status":"publish","type":"post","link":"https:\/\/gofullday.com\/incineration\/domestic-incinerator\/","title":{"rendered":"domestic incinerator"},"content":{"rendered":"<p> Documents to be submitted as following; <\/p>\n<ul>\n<li>Fabricators accreditations<\/li>\n<li>Test report to prove ZERO harmful emission level provided as samples form other installations<\/li>\n<li>Test report to prove sterility achieved at 6log to 10 level to be provided upon commissioning report and validation.<\/li>\n<\/ul>\n<p> &nbsp; <\/p>\n<p> Technical proposal include: <\/p>\n<ul>\n<li>The hospital should provide the necessary space: building &amp; infrastructure, sufficient power steam supply and<\/li>\n<\/ul>\n<p> connection up to room water &#038; sewer line into the room <\/p>\n<ul>\n<li>Room preparation: preparation, Renovation &amp; Modification of the room is suppliers responsibility<\/li>\n<li>The supplier should submit the necessary drawing showing space requirements ( room size (LxWxH) dimensions of<\/li>\n<\/ul>\n<p> processors &#038; ancillary equipment <\/p>\n<ul>\n<li>Supplier must give the proposal of the total power requirement of the whole unit and on which the hospital will<\/li>\n<\/ul>\n<p> guarantee the power supply.  However connections inside the room is providers responsibility <\/p>\n<ul>\n<li>The connection\/fittings form the processor and ancillary equipment to water and sewage line is suppliers<\/li>\n<\/ul>\n<p> duty.  <\/p>\n<ul>\n<li>A detailed training proposal including the duration of staff training on how to operate and maintain the processor<\/li>\n<li>A detailed maintenance schedule.<\/li>\n<li>List of spare parts and accessories required for maintenance of the system<\/li>\n<\/ul>\n<p> &nbsp; <\/p>\n<p> Warranty &#038; After Sales Services: <\/p>\n<ul>\n<li>Warranty period will be minimum 03 years or as offered by the manufacturer which comes later.<\/li>\n<li>Warranty period will be counted from the date of handing over of machine over of machine to the user in functioning<\/li>\n<\/ul>\n<p> condition i.e date of commission.  <\/p>\n<ul>\n<li>In warranty period supplier have to provided all maintenance &amp; repair services.<\/li>\n<li>Breach time will not be counted in warranty period.<\/li>\n<li>At least 10 years back up service (including warranty period) has to be ensured by the supplier.<\/li>\n<li>The repair\/maintenance work should be carried out within 72 hours after getting request for such from the user.<\/li>\n<\/ul>\n<p> &nbsp; <\/p>\n<p> Quality standard: CE\/FDA certificate of the offered item must be submitted with the offer.  <\/p>\n<ul>\n<li>For verification of the certificate bidder must submit the following :<\/li>\n<\/ul>\n<ol>\n<li>i) Mailing address of the issuer of the certificate.<\/li>\n<li>ii) Website, Email address &amp; Fax &amp; Telephone Number of the issuer.<\/li>\n<\/ol>\n<ul>\n<li>The bid will be non-responsive if:<\/li>\n<\/ul>\n<ol>\n<li>i) The certificate issuer can not be reached<\/li>\n<li>ii) The issuer fails to authentic the certificate within the bid validity<\/li>\n<\/ol>\n<p> iii)\u00a0\u00a0 The issuer verifies that the submitted certificate is faulty in terms of authenticity or validity.  <\/p>\n","protected":false},"excerpt":{"rendered":"<p>Documents to be submitted as following; Fabricators accreditations Test report to prove ZERO harmful emission level provided as samples form other installations Test report to prove sterility achieved [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":2020,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"_links":{"self":[{"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/posts\/3364"}],"collection":[{"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/comments?post=3364"}],"version-history":[{"count":1,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/posts\/3364\/revisions"}],"predecessor-version":[{"id":10192,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/posts\/3364\/revisions\/10192"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/media\/2020"}],"wp:attachment":[{"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/media?parent=3364"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/categories?post=3364"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/tags?post=3364"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}