{"id":3296,"date":"2024-10-26T17:31:41","date_gmt":"2024-10-26T17:31:41","guid":{"rendered":"https:\/\/www.hiclover.com\/?p=3296"},"modified":"2024-10-26T17:31:41","modified_gmt":"2024-10-26T17:31:41","slug":"hospital-incinerator-4","status":"publish","type":"post","link":"https:\/\/gofullday.com\/incineration\/hospital-incinerator-4\/","title":{"rendered":"hospital incinerator"},"content":{"rendered":"<p> * Burner with fuel, mono-bloc casting directing type with flat flame, lighting and security of electronic ignition, permanent ventilation, electromagnetic sluice gate of regulation and isolating valve.<br \/>\n* A regulator with electronic viewing for the temperature of combustion.<br \/>\n23.\u00a0\u00a0 \u00a0 The installed incinerator must bear a one year guarantee.<br \/>\n22.  Process Filtering system: Scruber to be mentionned as optional<br \/>\n25.  The technical training of operators will have to be supplied and given by a technician from<br \/>\n24.  CE Manufacturing Compliance: BS EN 746-2-1997<br \/>\nThe factory; it will consist of curative and preventative maintenance, and the use of equipment, etc <\/p>\n<p> NB.: Civil works and any other related services for the installation and training of operators must be included in the incinerator&#8217;s cost.<br \/>\nControl box watertight to dust, including: <\/p>\n<p> * A switch circuit breaker for each engine (ventilators and burners).<br \/>\nThis material and equipment must include in the drop of the incinerator: foundation in rubble stone, isolation roofing against humudity; elevation with brick of 20 cm (bloc cement), continuing lintel (linteau) in reinforced concrete; steel frame (charpente en metal); roof in sheet B.C.A. 28 BG (Toiture en t?le),metal gutter, sanitary setup (wash basin, soakway pit of 20 m of depth); ash pit of 30 m3,electric installation; concrete slab for fixing the incinerator; chanel for evacuation of rain water or waste water, wire mesh for aeration up the lintel; smooth rougtcasting of walls (interior and outside);plinth with cement; two metal doors;email paintings inside and latex paintings outside the home on walls and on doors; roof limit (planche de rive); steps for this specification will depend on the size of the incinerator which will determine the size of the drop of the incinerator., etc <\/p>\n<p>21. The de- ashing must be done in the bottom of the combustion chamber or the deashing should be Automatic or manual batch de ashing.<br \/>\n22. Process Filtering system : Scruber to be mentionned as optional<br \/>\n23. Emission Standards Compliance: BS 3316 or \u00e9quivalent standard<br \/>\n23. Capacity to treat Plastic: Not less than 40% by weight<br \/>\n24. CE Manufacturing Compliance: BS EN 746-2-1997<br \/>\n22.\u00a0\u00a0 \u00a0The supplier must give batches of spare parts of first urgency and consumable of the incinerator.<br \/>\n23.\u00a0\u00a0 \u00a0The installed incinerator must bear a one year guarantee.<br \/>\n24.\u00a0\u00a0 \u00a0The supplier shall perforn an onsite installation of the incinerator.<br \/>\n25. The technical training of operators will have to be provided and given by a technician from<br \/>\nthe factory; it will consist of curative and preventive maintenance, and the use of machine, etc<\/p>\n<p>NB.: Civil works and any other related services for the installation and training of operators must be included in the incinerator\u2019s price.<br \/>\nSpecification for the shelter of the incinerator: House of the incinerator inclusive in offer (the house must have facilities for hand washing and firefighting).<br \/>\nThis material and equipment must include in the shed of the incinerator: foundation in rubble stone, isolation roofing against humudity; elevation with brick of 20 cm (bloc cement), continuing lintel (linteau) in reinforced concrete; steel frame (charpente en metal); roofing in sheet B.C.A. 28 BG (Toiture en t?le),metal gutter, sanitary installation (wash basin, soakway pit of 20 m of depth); ash pit of 30 m3,electrical installation; concrete slab for fixing the incinerator; chanel for evacuation of rain water or waste water, wire mesh for aeration up the lintel; smooth rougtcasting of walls (interior and outside);plinth with cement; 2 metal doors ;email paintings inside and latex paintings outside the house on walls and on doors; roofing limit (planche de rive); measures for this specification will depend on the size of the incinerator which will determine the size of the shed of the incinerator., etc<\/p>\n","protected":false},"excerpt":{"rendered":"<p>* Burner with fuel, mono-bloc casting directing type with flat flame, lighting and security of electronic ignition, permanent ventilation, electromagnetic sluice gate of regulation and isolating valve. * [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":2017,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"_links":{"self":[{"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/posts\/3296"}],"collection":[{"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/comments?post=3296"}],"version-history":[{"count":1,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/posts\/3296\/revisions"}],"predecessor-version":[{"id":8975,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/posts\/3296\/revisions\/8975"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/media\/2017"}],"wp:attachment":[{"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/media?parent=3296"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/categories?post=3296"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/tags?post=3296"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}