{"id":3048,"date":"2024-03-26T05:09:57","date_gmt":"2024-03-26T05:09:57","guid":{"rendered":"https:\/\/www.hiclover.com\/?p=3048"},"modified":"2024-03-26T05:09:57","modified_gmt":"2024-03-26T05:09:57","slug":"waste-incinerator-manufacturers-china","status":"publish","type":"post","link":"https:\/\/gofullday.com\/incineration\/waste-incinerator-manufacturers-china\/","title":{"rendered":"waste incinerator manufacturers china"},"content":{"rendered":"<p> Capacity\u00a0\u00a0 \u00a0less than 500Kg\/hr.<br \/>\nFuel\u00a0\u00a0 \u00a0it ought to be double system, such as diesel and natural gas.<br \/>\nOperation\u00a0\u00a0 \u00a024hr-7days\/week continuous operation.<br \/>\nRetention time\u00a0\u00a0 \u00a0Of the flow gases less than 2 Sec in the hot portion.<br \/>\nFeeding System\u00a0\u00a0 \u00a0Should be auto feeding system into primary chamber.<br \/>\nTemp.\u00a0\u00a0 \u00a0<br \/>\nWet System\u00a0\u00a0 \u00a0If the machine equiped with a CEMS washing the flow gas with water, then it ought to be made from suitable anti corrossion materials, and equiped with pH meter to measure and neutralize the water.  It should be able to use the water in closed recycled circuit several times before treating\/ discharging into the sewage system in accordance with KEPARS.<br \/>\nChemical dosing\u00a0\u00a0 \u00a0it ought to be equiped with appropriate autochemical dosing system to control the pH for the water of the wet scrubber system including sensors.<br \/>\nDoors\u00a0\u00a0 \u00a0Should be lined with the same bricks, and the edges lined with special suitable insulating material to prevent any gas escaping, and the doors should be kept under negative pressure throughout the operation.<br \/>\nSecandry combustion chamber 1000-1200 C, with the possibility to be updated to 1400 C.<br \/>\nDetailed drawings, catalogs should be included.  <\/p>\n","protected":false},"excerpt":{"rendered":"<p>Capacity\u00a0\u00a0 \u00a0less than 500Kg\/hr. Fuel\u00a0\u00a0 \u00a0it ought to be double system, such as diesel and natural gas. Operation\u00a0\u00a0 \u00a024hr-7days\/week continuous operation. Retention time\u00a0\u00a0 \u00a0Of the flow gases less [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":2020,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"_links":{"self":[{"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/posts\/3048"}],"collection":[{"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/comments?post=3048"}],"version-history":[{"count":1,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/posts\/3048\/revisions"}],"predecessor-version":[{"id":9985,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/posts\/3048\/revisions\/9985"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/media\/2020"}],"wp:attachment":[{"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/media?parent=3048"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/categories?post=3048"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/tags?post=3048"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}