{"id":3047,"date":"2024-04-10T01:21:21","date_gmt":"2024-04-10T01:21:21","guid":{"rendered":"https:\/\/www.hiclover.com\/?p=3047"},"modified":"2024-04-10T01:21:21","modified_gmt":"2024-04-10T01:21:21","slug":"waste-burner-provider-in-china","status":"publish","type":"post","link":"https:\/\/gofullday.com\/incineration\/waste-burner-provider-in-china\/","title":{"rendered":"Waste burner provider in china"},"content":{"rendered":"<div class=\"topad\">\n\t\t\t\t\t\t\t\t\t\t<script async src=\"\/\/pagead2.googlesyndication.com\/pagead\/js\/adsbygoogle.js\"><\/script><\/p>\n<\/div>\n<ol>\n<li><b><\/b>Burning rate: 250 Kg\/hr.<\/li>\n<li><b><\/b>It should be able to Operate not Less than 10 hours\/day<\/li>\n<li><b><\/b>This incinerator must be able to destruct all combustible wastes produced by hospitals, private clinics, laboratories, institutes, etc\u2026<\/li>\n<li><b><\/b>Design Specification: Types A, B, C, D, and E of medical waste<\/li>\n<li><b><\/b>\u201cPYROLYTIC\u201d combustion, by controlling the gasification of waste.<\/li>\n<li><b><\/b>The incinerator must avoid the release of black smoke and fine dust, (Smokeless) during the loadings.<\/li>\n<li><b><\/b>It should be able to reduce the volume of wastes by 98%.<\/li>\n<li><b><\/b>It should be able to hold emission in the second burn with gas residence of not less than 2 seconds.<\/li>\n<\/ol>\n<ol start=\"9\">\n<li>The lower calorific power (L.C.P) of this waste will be <strong><b>3,500 kcal\/kg <\/b><\/strong><\/li>\n<\/ol>\n<ul>\n<li>The Temperatures of combustion:Minimum will be 850<sup>o<\/sup>C and max 1400<sup>o<\/sup>C<\/li>\n<li>Post combustion: &gt;1100<sup>o<\/sup><\/li>\n<\/ul>\n<ol start=\"10\">\n<li>The Internal diameter of the Chimney: \u00d8 400mm\u00b2 and its height: 8 Meter<\/li>\n<li>The Volume of the combustion chamber: Not Less Than 2.3 M\u00b3<\/li>\n<li>Burner operation should be Automatic On\/Off<\/li>\n<li>Fuel\u00a0: diesel, LPG, Natural Gas, Bio fuel<\/li>\n<li>The supplier must provide \u00a0necessary information for the best of \u00a0the installation<\/li>\n<\/ol>\n<p>  This burner using &#8220;PYROLYTIC&#8221; burning must have:  <\/p>\n<ol start=\"15\">\n<li>A combustion chamber of waste:<\/li>\n<\/ol>\n<p>  * Entirely restricted door for the hand-operated loading of waste.The packaging requirement to be Handbook, Set Lots,  <\/p>\n<p>  * A reduction of light that the usage is restricted to the ignition of waste.   <\/p>\n<p>  * Make-up of this refractory;  <\/p>\n<p>  * Burner of illumination of waste, with gasoline, conventional mono-bloc dispersing routing diving flame, lighting and safety of electronic ignition, permanent air flow, electromagnetic sluice entrance of standard and also isolating shutoff.   <\/p>\n<p>  * A reduction of burning of gases,  <\/p>\n<ul>\n<li>Refractory concrete :\n<ul>\n<li>. Thickness : \u2265100 mm<\/li>\n<li>. Nature: 42% of Al203<\/li>\n<\/ul>\n<\/li>\n<li>Insulate in fibrous panels :\n<ul>\n<li>. Thickness: \u226575 mm<\/li>\n<\/ul>\n<\/li>\n<li>Nature: Calcium silicate.<\/li>\n<\/ul>\n<p>  * A device of shot of air enabling a entire recombustion of gases,  <\/p>\n<p>  * A gadget of air inlet of air conditioning of waste gases,  <\/p>\n<ol start=\"16\">\n<li>Load Method: Top Loading<\/li>\n<\/ol>\n<ol start=\"17\">\n<li>A chamber of post combustion of gases<\/li>\n<\/ol>\n<p>  * A sheath of emptying of the gases blistered.  <\/p>\n<p>  * A burner of combustion of gases,  <\/p>\n<p>  * A device of shot of air enabling an entire recombustion of gases,  <\/p>\n<p>  * A gadget of air inlet of cooling of waste gases,  <\/p>\n<p>  * A sheath of evacuation of the gases scorched.   <\/p>\n<p>  * Carcass in solid sheet steel with support of link.   <\/p>\n<ul>\n<li>Refractory concrete :\n<ul>\n<li>Thickness : \u2265180 mm<\/li>\n<li>Nature: 65% of Al203<\/li>\n<\/ul>\n<\/li>\n<li>Insulate in fibrous panel :<\/li>\n<\/ul>\n<div class=\"bottomad\">\n\t\t\t\t\t\t\t\t\t\t<script async src=\"\/\/pagead2.googlesyndication.com\/pagead\/js\/adsbygoogle.js\"><\/script><\/p>\n<p>  * Composition of the refractory;  <\/p><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Burning rate: 250 Kg\/hr. It should be able to Operate not Less than 10 hours\/day This incinerator must be able to destruct all combustible wastes produced by hospitals, [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":2006,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"_links":{"self":[{"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/posts\/3047"}],"collection":[{"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/comments?post=3047"}],"version-history":[{"count":1,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/posts\/3047\/revisions"}],"predecessor-version":[{"id":8882,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/posts\/3047\/revisions\/8882"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/media\/2006"}],"wp:attachment":[{"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/media?parent=3047"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/categories?post=3047"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/tags?post=3047"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}