{"id":3045,"date":"2024-04-18T13:07:18","date_gmt":"2024-04-18T13:07:18","guid":{"rendered":"https:\/\/www.hiclover.com\/?p=3045"},"modified":"2024-04-18T13:07:18","modified_gmt":"2024-04-18T13:07:18","slug":"technical-incinerators-requirements-for-two-health-centers-in-kenya","status":"publish","type":"post","link":"https:\/\/gofullday.com\/incineration\/technical-incinerators-requirements-for-two-health-centers-in-kenya\/","title":{"rendered":"TECHNICAL INCINERATORS REQUIREMENTS FOR Two health centers in Kenya"},"content":{"rendered":"<div class=\"topad\">\n\t\t\t\t\t\t\t\t\t\t<script async src=\"\/\/pagead2.googlesyndication.com\/pagead\/js\/adsbygoogle.js\"><\/script><\/p>\n<\/div>\n<p>  NO  <\/p>\n<ul>\n<li>All the incinerators to be supplied and installed must meet the Government of Kenya waste Management Regulation 2006 in particular 3<sup>rd<\/sup>schedule regulation (26, 47) pertaining classification, standards, criteria, and procedure for installing\/operating incinerators as authored by the National Environmental Management and Coordination (waste management) regulation 2006, legal notice No. 121 of 29<sup>th<\/sup>\u00a0September 2006<\/li>\n<li>The capacity of the incinerator required should be to the specifications with a capacity to burn 100kgs\/Hr<\/li>\n<li>The incinerator shall be run on a 3-phase power supply (mains)<\/li>\n<li>For the technical evaluation, not only the treatment plant but the entire system will be considered. \u00a0It will be the responsibility of the Bidder to supply a full system, including all eventually additionally necessary secondary systems and additional equipment.<\/li>\n<li>The system offered shall be designed to operate normally under the conditions of the purchaser&#8217;s country. The conditions include Power Supply, Climate, Temperature, Humidity, etc.<\/li>\n<li>The Bidder must provide a warranty for one year.<\/li>\n<li>All text, parameter etc. on all control operating interfaces as well as on information displays and on print-outs shall be in English language.<\/li>\n<li>The Bidder is responsible for all permits and approvals for importation. The Bidder shall provide all the necessary documentation in order to facilitate the legal requirements for the installation and putting into use of the equipment.<\/li>\n<li>Period of Execution is 90 days from contract signature for delivery to site and completion of all verification operations required for the issuance of provisional acceptance.<\/li>\n<li>Representatives of the Contracting Authority and the Beneficiary, together with the Bidder\u2019s representative, shall carry out the controls, testing and initial approval for provisional and final acceptance as. \u00a0The provisional and final acceptance shall take place at the final destination.<\/li>\n<li>After-Sales Service: The Bidder is required to ensure that a maintenance, service and repair centre, which is authorised by the Manufacturer, and which is able to rapidly supply genuine spare parts and consumables recommended by the Manufacturer is available throughout the one year warranty period. In fulfillment of this requirement with their offer Bidders must submit a statement signed by a representative of the manufacturer:\n<ul>\n<li>Providing the name and address of its authorised maintenance, service and repair centre,<\/li>\n<li>Confirming that this authorised maintenance, service and repair centre is able to rapidly supply genuine spare parts and the consumables recommended by the Manufacturer; and<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n<ul>\n<li>The Bidder will be responsible to deliver and install all to be supplied equipment at to be set up waste handling areas in the Republic of Kenya. The Bidder shall deliver a time schedule over the complete construction and assembling period. The delivery and installation time must be agreed between bidders, target Hospital and the Contracting Authority. The treatment plant must arrive pre-assembled. The Bidder shall ensure that all parts of the plant transported by sea shall not be shipped as \u201cdeck cargo\u201d.<\/li>\n<\/ul>\n<ul>\n<li>It is expected that the Bidder cooperates closely with the contractor for the new waste handling building\/area and will make available all needed technical information, drawing, etc. to the contractor.<\/li>\n<\/ul>\n<ul>\n<li>The Bidder shall supply and install the incinerator with the following attached specifications<\/li>\n<\/ul>\n<\/p>\n<\/p>\n<table>\n<tbody>\n<tr>\n<td width=\"53\">&nbsp;<\/td>\n<td width=\"296\">&nbsp;<\/td>\n<td width=\"53\">&nbsp;<\/td>\n<td width=\"56\">&nbsp;<\/td>\n<td width=\"77\">&nbsp;<\/td>\n<td width=\"112\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td colspan=\"6\" width=\"648\"><strong><b>TECHNICAL INCINERATORS SPECIFICATIONS FOR EAPHLNP <\/b><\/strong><\/td>\n<\/tr>\n<tr>\n<td width=\"53\"><strong><b>\u00a0<\/b><\/strong><\/td>\n<td width=\"296\">&nbsp;<\/td>\n<td width=\"53\">&nbsp;<\/td>\n<td width=\"56\">&nbsp;<\/td>\n<td width=\"77\">&nbsp;<\/td>\n<td width=\"112\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td width=\"53\"><strong><b>ITEM<\/b><\/strong><\/td>\n<td width=\"296\"><strong><b>DESCRIPTION<\/b><\/strong><\/td>\n<td width=\"53\"><strong><b>UNIT<\/b><\/strong><\/td>\n<td width=\"56\"><strong><b>QTY<\/b><\/strong><\/td>\n<td width=\"77\"><strong><b>RATE<\/b><\/strong><\/td>\n<td width=\"112\"><strong><b>KSHS.<\/b><\/strong><\/td>\n<\/tr>\n<tr>\n<td width=\"53\"><strong><b>\u00a0<\/b><\/strong><\/td>\n<td width=\"296\"><strong><b>\u00a0<\/b><\/strong><\/td>\n<td width=\"53\"><strong><b>\u00a0<\/b><\/strong><\/td>\n<td width=\"56\"><strong><b>\u00a0<\/b><\/strong><\/td>\n<td width=\"77\">&nbsp;<\/td>\n<td width=\"112\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td width=\"53\">&nbsp;<\/td>\n<td width=\"296\"><strong><u><b>Incinerator<\/b><\/u><\/strong><\/td>\n<td width=\"53\">&nbsp;<\/td>\n<td width=\"56\">&nbsp;<\/td>\n<td width=\"77\">&nbsp;<\/td>\n<td width=\"112\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td width=\"53\">&nbsp;<\/td>\n<td width=\"296\">To supply and install the following<\/td>\n<td width=\"53\">&nbsp;<\/td>\n<td width=\"56\">\u00a02NO.<\/td>\n<td width=\"77\">&nbsp;<\/td>\n<td width=\"112\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td width=\"53\">&nbsp;<\/td>\n<td width=\"296\">Hospital Incinerators to Nema standards<\/td>\n<td width=\"53\">&nbsp;<\/td>\n<td width=\"56\">&nbsp;<\/td>\n<td width=\"77\">&nbsp;<\/td>\n<td width=\"112\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td width=\"53\">&nbsp;<\/td>\n<td width=\"296\">The following are the incinerator specifications :-<\/td>\n<td width=\"53\">&nbsp;<\/td>\n<td width=\"56\">&nbsp;<\/td>\n<td width=\"77\">&nbsp;<\/td>\n<td width=\"112\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td width=\"53\">A<\/td>\n<td width=\"296\">\u00d8\u00a0\u00a0\u00a0\u00a0\u00a0 Waste type: \u00a0\u00a0\u00a0\u00a0\u00a0Mixed type 0,1,2,3 &amp; 4 hospital\/clinical bio hazard waste<\/td>\n<td width=\"53\">&nbsp;<\/td>\n<td width=\"56\">&nbsp;<\/td>\n<td width=\"77\">&nbsp;<\/td>\n<td width=\"112\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td width=\"53\">&nbsp;<\/td>\n<td width=\"296\">\u00d8\u00a0\u00a0\u00a0\u00a0\u00a0 Waste density: \u00a0\u00a0125 to 350Kg\/M\u00b3<\/td>\n<td width=\"53\">&nbsp;<\/td>\n<td width=\"56\">&nbsp;<\/td>\n<td width=\"77\">&nbsp;<\/td>\n<td width=\"112\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td width=\"53\">&nbsp;<\/td>\n<td width=\"296\">\u00d8\u00a0\u00a0\u00a0\u00a0\u00a0 Waste CV: \u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a04000 KCAL\/Kg<\/td>\n<td width=\"53\">&nbsp;<\/td>\n<td width=\"56\">&nbsp;<\/td>\n<td width=\"77\">&nbsp;<\/td>\n<td width=\"112\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td width=\"53\">&nbsp;<\/td>\n<td width=\"296\">\u00d8\u00a0\u00a0\u00a0\u00a0\u00a0 Moisture content: \u00a0\u00a010-25%<\/td>\n<td width=\"53\">&nbsp;<\/td>\n<td width=\"56\">&nbsp;<\/td>\n<td width=\"77\">&nbsp;<\/td>\n<td width=\"112\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td width=\"53\">&nbsp;<\/td>\n<td width=\"296\">\u00d8\u00a0\u00a0\u00a0\u00a0\u00a0 Estimated ash residue: 5-10%<\/td>\n<td width=\"53\">&nbsp;<\/td>\n<td width=\"56\">&nbsp;<\/td>\n<td width=\"77\">&nbsp;<\/td>\n<td width=\"112\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td width=\"53\">&nbsp;<\/td>\n<td width=\"296\">\u00d8\u00a0\u00a0\u00a0\u00a0\u00a0 Nominal capacity: \u00a0\u00a0100Kg\/hour batch load<\/td>\n<td width=\"53\">&nbsp;<\/td>\n<td width=\"56\">&nbsp;<\/td>\n<td width=\"77\">&nbsp;<\/td>\n<td width=\"112\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td width=\"53\">&nbsp;<\/td>\n<td width=\"296\">\u00d8\u00a0\u00a0\u00a0\u00a0\u00a0 Secondary chamber: \u00a02 second @ 1100\u00baC<\/td>\n<td width=\"53\">&nbsp;<\/td>\n<td width=\"56\">&nbsp;<\/td>\n<td width=\"77\">&nbsp;<\/td>\n<td width=\"112\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td width=\"53\">&nbsp;<\/td>\n<td width=\"296\">\u00d8\u00a0\u00a0\u00a0\u00a0\u00a0 Environmental: \u00a0\u00a0\u00a0NEMA ACT \u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0(EMCA) 1999<\/td>\n<td width=\"53\">&nbsp;<\/td>\n<td width=\"56\">&nbsp;<\/td>\n<td width=\"77\">&nbsp;<\/td>\n<td width=\"112\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td width=\"53\">&nbsp;<\/td>\n<td width=\"296\">\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0Clean Air Act 1999<\/td>\n<td width=\"53\">&nbsp;<\/td>\n<td width=\"56\">&nbsp;<\/td>\n<td width=\"77\">&nbsp;<\/td>\n<td width=\"112\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td width=\"53\">&nbsp;<\/td>\n<td width=\"296\">BS3316 1987<\/td>\n<td width=\"53\">&nbsp;<\/td>\n<td width=\"56\">&nbsp;<\/td>\n<td width=\"77\">&nbsp;<\/td>\n<td width=\"112\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td width=\"53\">&nbsp;<\/td>\n<td width=\"296\"><strong><b>Equipment <\/b><\/strong><\/td>\n<td width=\"53\">Set<\/td>\n<td width=\"56\">&nbsp;<\/td>\n<td width=\"77\">&nbsp;<\/td>\n<td width=\"112\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td width=\"53\">&nbsp;<\/td>\n<td width=\"296\">The Incinerator must comprise of: &#8211;<\/td>\n<td width=\"53\">&nbsp;<\/td>\n<td width=\"56\">&nbsp;<\/td>\n<td width=\"77\">&nbsp;<\/td>\n<td width=\"112\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td width=\"53\">&nbsp;<\/td>\n<td width=\"296\">\u00d8\u00a0\u00a0\u00a0\u00a0\u00a0 Manual Loading door (heavy duty steel door with appropriate refractory lining)<\/td>\n<td width=\"53\">&nbsp;<\/td>\n<td width=\"56\">&nbsp;<\/td>\n<td width=\"77\">&nbsp;<\/td>\n<td width=\"112\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td width=\"53\">&nbsp;<\/td>\n<td width=\"296\">\u00d8\u00a0\u00a0\u00a0\u00a0\u00a0 Horizontal solid hearth, refractory lined primary combustion chamber 800mm diameter x 2100mm long<\/td>\n<td width=\"53\">&nbsp;<\/td>\n<td width=\"56\">&nbsp;<\/td>\n<td width=\"77\">&nbsp;<\/td>\n<td width=\"112\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td width=\"53\">&nbsp;<\/td>\n<td width=\"296\">\u00d8\u00a0\u00a0\u00a0\u00a0\u00a0 Full sized bulk load\/ash removal door<\/td>\n<td width=\"53\">&nbsp;<\/td>\n<td width=\"56\">&nbsp;<\/td>\n<td width=\"77\">&nbsp;<\/td>\n<td width=\"112\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td width=\"53\">&nbsp;<\/td>\n<td width=\"296\">\u00d8\u00a0\u00a0\u00a0\u00a0\u00a0 1 off diesel-fired ignition burner \u2013 temperature controlled<\/td>\n<td width=\"53\">&nbsp;<\/td>\n<td width=\"56\">&nbsp;<\/td>\n<td width=\"77\">&nbsp;<\/td>\n<td width=\"112\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td width=\"53\">&nbsp;<\/td>\n<td width=\"296\">\u00d8\u00a0\u00a0\u00a0\u00a0\u00a0 1 off combustion air supply fan and distribution system, automatic control<\/td>\n<td width=\"53\">&nbsp;<\/td>\n<td width=\"56\">&nbsp;<\/td>\n<td width=\"77\">&nbsp;<\/td>\n<td width=\"112\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td width=\"53\">&nbsp;<\/td>\n<td width=\"296\">\u00d8\u00a0\u00a0\u00a0\u00a0\u00a0 High capacity secondary combustion chamber 2 second @ 1100\u00baC with<\/td>\n<td width=\"53\">&nbsp;<\/td>\n<td width=\"56\">&nbsp;<\/td>\n<td width=\"77\">&nbsp;<\/td>\n<td width=\"112\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td width=\"53\">&nbsp;<\/td>\n<td width=\"296\">\u00d8\u00a0\u00a0\u00a0\u00a0\u00a0 1 off diesel-fired afterburner \u2013 temperature controlled<\/td>\n<td width=\"53\">&nbsp;<\/td>\n<td width=\"56\">&nbsp;<\/td>\n<td width=\"77\">&nbsp;<\/td>\n<td width=\"112\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td width=\"53\">&nbsp;<\/td>\n<td width=\"296\">\u00d8\u00a0\u00a0\u00a0\u00a0\u00a0 Control Panel \u2013 automatic operation<\/td>\n<td width=\"53\">&nbsp;<\/td>\n<td width=\"56\">&nbsp;<\/td>\n<td width=\"77\">&nbsp;<\/td>\n<td width=\"112\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td width=\"53\">&nbsp;<\/td>\n<td width=\"296\">\u00d8\u00a0\u00a0\u00a0\u00a0\u00a0 Temperature indication primary and secondary chambers 0-1200\u00baC. Both chambers must be insulated with refractory material (super duty 100mm thick firebrick with 25mm thick calcium silicate insulation)<\/td>\n<td width=\"53\">&nbsp;<\/td>\n<td width=\"56\">&nbsp;<\/td>\n<td width=\"77\">&nbsp;<\/td>\n<td width=\"112\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td width=\"53\">&nbsp;<\/td>\n<td width=\"296\">\u00d8\u00a0\u00a0\u00a0\u00a0\u00a0 Refractory lined flanged chimney to a height of 10M and it must be 3m above the height of any existing roof adjacent to the incinerator<\/td>\n<td width=\"53\">&nbsp;<\/td>\n<td width=\"56\">&nbsp;<\/td>\n<td width=\"77\">&nbsp;<\/td>\n<td width=\"112\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td width=\"53\">&nbsp;<\/td>\n<td width=\"296\"><strong><b>Carried Forward To Collection Page.<\/b><\/strong><\/td>\n<td width=\"53\">&nbsp;<\/td>\n<td width=\"56\">&nbsp;<\/td>\n<td width=\"77\">&nbsp;<\/td>\n<td width=\"112\"><strong><b>\u00a0<\/b><\/strong><\/td>\n<\/tr>\n<tr>\n<td width=\"53\"><strong><b>\u00a0<\/b><\/strong><\/p>\n<\/p>\n<\/td>\n<td width=\"296\">NOTE: WE REQUIRE TWO INCINERATORS. ONE<\/td>\n<td width=\"53\">&nbsp;<\/td>\n<td width=\"56\">&nbsp;<\/td>\n<td width=\"77\">&nbsp;<\/td>\n<td width=\"112\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td width=\"53\"><strong><b>ITEM<\/b><\/strong><\/td>\n<td width=\"296\"><strong><b>DESCRIPTION<\/b><\/strong><\/td>\n<td width=\"53\"><strong><b>UNIT<\/b><\/strong><\/td>\n<td width=\"56\"><strong><b>QTY<\/b><\/strong><\/td>\n<td width=\"77\"><strong><b>RATE<\/b><\/strong><\/td>\n<td width=\"112\"><strong><b>KSHS.<\/b><\/strong><\/td>\n<\/tr>\n<tr>\n<td width=\"53\">B<\/td>\n<td width=\"296\"><strong><b>Diesel Tank:<\/b><\/strong><\/td>\n<td width=\"53\">&nbsp;<\/td>\n<td width=\"56\">&nbsp;<\/td>\n<td width=\"77\">&nbsp;<\/td>\n<td width=\"112\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td width=\"53\">&nbsp;<\/td>\n<td width=\"296\">To provide for diesel service tank (Capacity 400 litres) including level indicator<\/p>\n<p>  NO  <\/td>\n<td width=\"53\">Item<\/td>\n<td width=\"56\">1<\/td>\n<td width=\"77\">&nbsp;<\/td>\n<td width=\"112\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td width=\"53\">C<\/td>\n<td width=\"296\"><strong><b>Installation &amp; commissioning works<\/b><\/strong><\/td>\n<td width=\"53\">&nbsp;<\/td>\n<td width=\"56\">&nbsp;<\/td>\n<td width=\"77\">&nbsp;<\/td>\n<td width=\"112\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td width=\"53\">D<\/td>\n<td width=\"296\">Positioning of Incinerator: &#8211;<\/p>\n<p>  1  <\/td>\n<td width=\"53\">Item<\/td>\n<td width=\"56\">1<\/td>\n<td width=\"77\">&nbsp;<\/td>\n<td width=\"112\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td width=\"53\">E<\/td>\n<td width=\"296\">Connect burners to fuel supply.<\/td>\n<td width=\"53\">No.<\/td>\n<td width=\"56\">2<\/td>\n<td width=\"77\">&nbsp;<\/td>\n<td width=\"112\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td width=\"53\">F<\/td>\n<td width=\"296\"><strong><b>Chimney Installation:<\/b><\/strong><\/td>\n<td width=\"53\">&nbsp;<\/td>\n<td width=\"56\">&nbsp;<\/td>\n<td width=\"77\">&nbsp;<\/td>\n<td width=\"112\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td width=\"53\">\u00a0G<\/td>\n<td width=\"296\">Composition of the chimney: &#8211;<\/p>\n<p>  NO  <\/p>\n<p>  1  <\/p>\n<p>  Hallmark of tenderer  <\/td>\n<td width=\"53\">Item.<\/td>\n<td width=\"56\">1<\/td>\n<td width=\"77\">&nbsp;<\/td>\n<td width=\"112\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td width=\"53\">H<\/td>\n<td width=\"296\"><strong><b>Commissioning &amp; Training:<\/b><\/strong><\/td>\n<td width=\"53\">&nbsp;<\/td>\n<td width=\"56\">&nbsp;<\/td>\n<td width=\"77\">&nbsp;<\/td>\n<td width=\"112\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td width=\"53\">&nbsp;<\/td>\n<td width=\"296\">Testing set operating parameters, training of operators and technical staff.<\/td>\n<td width=\"53\">Item<\/td>\n<td width=\"56\">1<\/td>\n<td width=\"77\">&nbsp;<\/td>\n<td width=\"112\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td width=\"53\">I<\/td>\n<td width=\"296\"><strong><b>Commissioning Maintenance Contract<\/b><\/strong><\/td>\n<td width=\"53\">&nbsp;<\/td>\n<td width=\"56\">&nbsp;<\/td>\n<td width=\"77\">&nbsp;<\/td>\n<td width=\"112\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td width=\"53\">&nbsp;<\/td>\n<td width=\"296\">Before the expiry of the warranty\/signing off, the suppler shall provide a one-year replacement service parts (e.g. filters, air filters), the Quarterly routine maintenance price per quarter for three (3) quarters. Maintenance contract proposal). \u00a0The maintenance contract price includes labour, transport and accommodation for the attending technicians.<\/td>\n<td width=\"53\">Item<\/td>\n<td width=\"56\">3<\/td>\n<td width=\"77\">&nbsp;<\/td>\n<td width=\"112\">&nbsp;<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/p>\n<\/p>\n<p>  Note: In situation of variance in between system price and total quantity, the device cost will control.   <\/p>\n<p>  AREA VI &#8211; &#8211; &#8211; &#8211; CONVENTIONAL FORMS  <\/p>\n<p>  TECHNICAL INCINERATORS SPECS FOR 2 clinical facilities <\/p>\n<p>  INTRODUCTORY  <\/p>\n<p>  The container need to be affixed to the incinerator in a greater level to make it possible for free-flow of petrol from the storage tank to the burner.   <\/p>\n<p>  EXAM CRITERIA  <\/p>\n<p>  Analysis will be implemented in 4 phases specifically preliminary examination of files for uniformity with required requirements, technical evaluation, site check out and likewise industrial examination.   <\/p>\n<\/p>\n<table>\n<tbody>\n<tr>\n<td width=\"53\"><strong><b>ITEM<\/b><\/strong><\/td>\n<td width=\"296\"><strong><b>DESCRIPTION<\/b><\/strong><\/td>\n<td width=\"53\"><strong><b>UNIT<\/b><\/strong><\/td>\n<td width=\"56\"><strong><b>QTY<\/b><\/strong><\/td>\n<td width=\"107\"><strong><b>MARKS ALLOCATED \u00a0<\/b><\/strong><\/td>\n<td width=\"112\"><strong><b>MARKS RECEIVED \u00a0<\/b><\/strong><\/td>\n<\/tr>\n<tr>\n<td width=\"53\"><strong><b>\u00a0<\/b><\/strong><\/td>\n<td width=\"296\"><strong><b>\u00a0<\/b><\/strong><\/td>\n<td width=\"53\"><strong><b>\u00a0<\/b><\/strong><\/td>\n<td width=\"56\"><strong><b>\u00a0<\/b><\/strong><\/td>\n<td width=\"107\">&nbsp;<\/td>\n<td width=\"112\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td width=\"53\">&nbsp;<\/td>\n<td width=\"296\"><strong><u><b>Incinerator<\/b><\/u><\/strong><\/td>\n<td width=\"53\">&nbsp;<\/td>\n<td width=\"56\">&nbsp;<\/td>\n<td width=\"107\">&nbsp;<\/td>\n<td width=\"112\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td width=\"53\">&nbsp;<\/td>\n<td width=\"296\">To supply and install the following<\/td>\n<td width=\"53\">&nbsp;<\/td>\n<td width=\"56\">\u00a02NO.<\/td>\n<td width=\"107\">&nbsp;<\/td>\n<td width=\"112\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td width=\"53\">&nbsp;<\/td>\n<td width=\"296\">Hospital Incinerator to Nema standards<\/td>\n<td width=\"53\">&nbsp;<\/td>\n<td width=\"56\">&nbsp;<\/td>\n<td width=\"107\">&nbsp;<\/td>\n<td width=\"112\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td width=\"53\">&nbsp;<\/p>\n<\/td>\n<td width=\"296\">The following are the incinerator specifications :-<\/td>\n<td width=\"53\">&nbsp;<\/td>\n<td width=\"56\">&nbsp;<\/td>\n<td width=\"107\">&nbsp;<\/td>\n<td width=\"112\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td width=\"53\">&nbsp;<\/td>\n<td width=\"296\">&nbsp;<\/td>\n<td width=\"53\">&nbsp;<\/td>\n<td width=\"56\">&nbsp;<\/td>\n<td width=\"107\">&nbsp;<\/td>\n<td width=\"112\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td width=\"53\">A<\/td>\n<td width=\"296\">\u00d8\u00a0\u00a0\u00a0\u00a0\u00a0 Waste type: \u00a0\u00a0\u00a0\u00a0\u00a0Mixed type 0,1,2,3 &amp; 4 hospital\/clinical bio hazard waste<\/td>\n<td width=\"53\">&nbsp;<\/td>\n<td width=\"56\">&nbsp;<\/td>\n<td width=\"107\">35<\/td>\n<td width=\"112\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td width=\"53\">&nbsp;<\/td>\n<td width=\"296\">\u00d8\u00a0\u00a0\u00a0\u00a0\u00a0 Waste density: \u00a0\u00a0125 to 350Kg\/M\u00b3<\/td>\n<td width=\"53\">&nbsp;<\/td>\n<td width=\"56\">&nbsp;<\/td>\n<td width=\"107\">&nbsp;<\/td>\n<td width=\"112\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td width=\"53\">&nbsp;<\/td>\n<td width=\"296\">\u00d8\u00a0\u00a0\u00a0\u00a0\u00a0 Waste CV: \u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a04000 KCAL\/Kg<\/td>\n<td width=\"53\">&nbsp;<\/td>\n<td width=\"56\">&nbsp;<\/td>\n<td width=\"107\">&nbsp;<\/td>\n<td width=\"112\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td width=\"53\">&nbsp;<\/td>\n<td width=\"296\">\u00d8\u00a0\u00a0\u00a0\u00a0\u00a0 Moisture content: \u00a0\u00a010-25%<\/td>\n<td width=\"53\">&nbsp;<\/td>\n<td width=\"56\">&nbsp;<\/td>\n<td width=\"107\">&nbsp;<\/td>\n<td width=\"112\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td width=\"53\">&nbsp;<\/td>\n<td width=\"296\">\u00d8\u00a0\u00a0\u00a0\u00a0\u00a0 Estimated ash residue: 5-10%<\/td>\n<td width=\"53\">&nbsp;<\/td>\n<td width=\"56\">&nbsp;<\/td>\n<td width=\"107\">&nbsp;<\/td>\n<td width=\"112\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td width=\"53\">&nbsp;<\/td>\n<td width=\"296\">\u00d8\u00a0\u00a0\u00a0\u00a0\u00a0 Nominal capacity: \u00a0\u00a0100Kg\/hour batch load<\/td>\n<td width=\"53\">&nbsp;<\/td>\n<td width=\"56\">&nbsp;<\/td>\n<td width=\"107\">&nbsp;<\/td>\n<td width=\"112\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td width=\"53\">&nbsp;<\/td>\n<td width=\"296\">\u00d8\u00a0\u00a0\u00a0\u00a0\u00a0 Secondary chamber: \u00a02 second @ 1100\u00baC<\/td>\n<td width=\"53\">&nbsp;<\/td>\n<td width=\"56\">&nbsp;<\/td>\n<td width=\"107\">&nbsp;<\/td>\n<td width=\"112\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td width=\"53\">&nbsp;<\/td>\n<td width=\"296\">\u00d8\u00a0\u00a0\u00a0\u00a0\u00a0 Environmental: \u00a0\u00a0\u00a0NEMA ACT \u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0(EMCA) 1999<\/td>\n<td width=\"53\">&nbsp;<\/td>\n<td width=\"56\">&nbsp;<\/td>\n<td width=\"107\">&nbsp;<\/td>\n<td width=\"112\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td width=\"53\">&nbsp;<\/td>\n<td width=\"296\">\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0Clean Air Act 1999<\/td>\n<td width=\"53\">&nbsp;<\/td>\n<td width=\"56\">&nbsp;<\/td>\n<td width=\"107\">&nbsp;<\/td>\n<td width=\"112\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td width=\"53\">&nbsp;<\/td>\n<td width=\"296\">BS3316 1987<\/td>\n<td width=\"53\">&nbsp;<\/td>\n<td width=\"56\">&nbsp;<\/td>\n<td width=\"107\">&nbsp;<\/td>\n<td width=\"112\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td width=\"53\">&nbsp;<\/td>\n<td width=\"296\"><strong><b>Equipment <\/b><\/strong><\/td>\n<td width=\"53\">Set<\/td>\n<td width=\"56\">&nbsp;<\/td>\n<td width=\"107\">&nbsp;<\/td>\n<td width=\"112\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td width=\"53\">&nbsp;<\/td>\n<td width=\"296\">The Incinerator must comprise of: &#8211;<\/td>\n<td width=\"53\">&nbsp;<\/td>\n<td width=\"56\">&nbsp;<\/td>\n<td width=\"107\">&nbsp;<\/td>\n<td width=\"112\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td width=\"53\">&nbsp;<\/td>\n<td width=\"296\">\u00d8\u00a0\u00a0\u00a0\u00a0\u00a0 Manual Loading door (heavy duty steel door with appropriate refractory lining)<\/td>\n<td width=\"53\">&nbsp;<\/td>\n<td width=\"56\">&nbsp;<\/td>\n<td width=\"107\">&nbsp;<\/td>\n<td width=\"112\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td width=\"53\">&nbsp;<\/td>\n<td width=\"296\">\u00d8\u00a0\u00a0\u00a0\u00a0\u00a0 Horizontal solid hearth, refractory lined primary combustion chamber 800mm diameter x 2100mm long<\/td>\n<td width=\"53\">&nbsp;<\/td>\n<td width=\"56\">&nbsp;<\/td>\n<td width=\"107\">&nbsp;<\/td>\n<td width=\"112\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td width=\"53\">&nbsp;<\/td>\n<td width=\"296\">\u00d8\u00a0\u00a0\u00a0\u00a0\u00a0 Full sized bulk load\/ash removal door<\/td>\n<td width=\"53\">&nbsp;<\/td>\n<td width=\"56\">&nbsp;<\/td>\n<td width=\"107\">&nbsp;<\/td>\n<td width=\"112\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td width=\"53\">&nbsp;<\/td>\n<td width=\"296\">\u00d8\u00a0\u00a0\u00a0\u00a0\u00a0 1 off diesel-fired ignition burner \u2013 temperature controlled<\/td>\n<td width=\"53\">&nbsp;<\/td>\n<td width=\"56\">&nbsp;<\/td>\n<td width=\"107\">&nbsp;<\/td>\n<td width=\"112\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td width=\"53\">&nbsp;<\/td>\n<td width=\"296\">\u00d8\u00a0\u00a0\u00a0\u00a0\u00a0 1 off combustion air supply fan and distribution system, automatic control<\/td>\n<td width=\"53\">&nbsp;<\/td>\n<td width=\"56\">&nbsp;<\/td>\n<td width=\"107\">&nbsp;<\/td>\n<td width=\"112\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td width=\"53\">&nbsp;<\/td>\n<td width=\"296\">\u00d8\u00a0\u00a0\u00a0\u00a0\u00a0 High capacity secondary combustion chamber 2 second @ 1100\u00baC with<\/td>\n<td width=\"53\">&nbsp;<\/td>\n<td width=\"56\">&nbsp;<\/td>\n<td width=\"107\">&nbsp;<\/td>\n<td width=\"112\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td width=\"53\">&nbsp;<\/td>\n<td width=\"296\">\u00d8\u00a0\u00a0\u00a0\u00a0\u00a0 1 off diesel-fired afterburner \u2013 temperature controlled<\/td>\n<td width=\"53\">&nbsp;<\/td>\n<td width=\"56\">&nbsp;<\/td>\n<td width=\"107\">&nbsp;<\/td>\n<td width=\"112\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td width=\"53\">&nbsp;<\/td>\n<td width=\"296\">\u00d8\u00a0\u00a0\u00a0\u00a0\u00a0 Control Panel \u2013 automatic operation<\/td>\n<td width=\"53\">&nbsp;<\/td>\n<td width=\"56\">&nbsp;<\/td>\n<td width=\"107\">&nbsp;<\/td>\n<td width=\"112\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td width=\"53\">&nbsp;<\/td>\n<td width=\"296\">\u00d8\u00a0\u00a0\u00a0\u00a0\u00a0 Temperature indication primary and secondary chambers 0-1200\u00baC. Both chambers must be insulated with refractory material (super duty 100mm thick firebrick with 25mm thick calcium silicate insulation)<\/td>\n<td width=\"53\">&nbsp;<\/td>\n<td width=\"56\">&nbsp;<\/td>\n<td width=\"107\">&nbsp;<\/td>\n<td width=\"112\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td width=\"53\">&nbsp;<\/td>\n<td width=\"296\">\u00d8\u00a0\u00a0\u00a0\u00a0\u00a0 Refractory lined flanged chimney to a height of 10M and it must be 3m above the height of any existing roof adjacent to the incinerator<\/td>\n<td width=\"53\">&nbsp;<\/td>\n<td width=\"56\">&nbsp;<\/td>\n<td width=\"107\">&nbsp;<\/td>\n<td width=\"112\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td width=\"53\"><strong><b>\u00a0<\/b><\/strong><\/td>\n<td width=\"296\">&nbsp;<\/td>\n<td width=\"53\">&nbsp;<\/td>\n<td width=\"56\">&nbsp;<\/td>\n<td width=\"107\">&nbsp;<\/td>\n<td width=\"112\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td width=\"53\"><strong><b>ITEM<\/b><\/strong><\/td>\n<td width=\"296\"><strong><b>DESCRIPTION<\/b><\/strong><\/td>\n<td width=\"53\"><strong><b>UNIT<\/b><\/strong><\/td>\n<td width=\"56\"><strong><b>QTY<\/b><\/strong><\/td>\n<td width=\"107\"><strong><b>RATE<\/b><\/strong><\/td>\n<td width=\"112\"><strong><b>KSHS.<\/b><\/strong><\/td>\n<\/tr>\n<tr>\n<td width=\"53\">B<\/td>\n<td width=\"296\"><strong><b>Diesel Tank:<\/b><\/strong><\/td>\n<td width=\"53\">&nbsp;<\/td>\n<td width=\"56\">&nbsp;<\/td>\n<td width=\"107\">&nbsp;<\/td>\n<td width=\"112\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td width=\"53\">&nbsp;<\/td>\n<td width=\"296\">To provide for diesel service tank (Capacity 400 litres) including level indicator<\/p>\n<p>  100  <\/td>\n<td width=\"53\">Item<\/td>\n<td width=\"56\">1<\/td>\n<td width=\"107\">20<\/td>\n<td width=\"112\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td width=\"53\">C<\/td>\n<td width=\"296\"><strong><b>Installation &amp; commissioning works<\/b><\/strong><\/td>\n<td width=\"53\">&nbsp;<\/td>\n<td width=\"56\">&nbsp;<\/td>\n<td width=\"107\">&nbsp;<\/td>\n<td width=\"112\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td width=\"53\">D<\/td>\n<td width=\"296\">Positioning of Incinerator: &#8211;<\/p>\n<p>  Pass mark for technological evaluation is 70\/100 marks  <\/td>\n<td width=\"53\">Item<\/td>\n<td width=\"56\">1<\/td>\n<td width=\"107\">10<\/td>\n<td width=\"112\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td width=\"53\">E<\/td>\n<td width=\"296\">Connect burners to fuel supply.<\/td>\n<td width=\"53\">No.<\/td>\n<td width=\"56\">2<\/td>\n<td width=\"107\">5<\/td>\n<td width=\"112\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td width=\"53\">F<\/td>\n<td width=\"296\"><strong><b>Chimney Installation:<\/b><\/strong><\/td>\n<td width=\"53\">&nbsp;<\/td>\n<td width=\"56\">&nbsp;<\/td>\n<td width=\"107\">&nbsp;<\/td>\n<td width=\"112\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td width=\"53\">\u00a0G<\/td>\n<td width=\"296\">Composition of the chimney: &#8211;<\/p>\n<p>  Phase 3: Web Site Browse Through  <\/p>\n<p>  The evaluation board will inspect out the properties of the prospective buyers that are responsive to technical evaluation phase to validate the credibility of lawful data sent outside; develop the accuracy of the details provided in the tender documents, analyze company&#8217;s ability, location, to call a few.   <\/p>\n<p>  Phase 4 Business Analysis  <\/td>\n<td width=\"53\">Item.<\/td>\n<td width=\"56\">1<\/td>\n<td width=\"107\">10<\/td>\n<td width=\"112\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td width=\"53\">H<\/td>\n<td width=\"296\"><strong><b>Commissioning &amp; Training:<\/b><\/strong><\/td>\n<td width=\"53\">&nbsp;<\/td>\n<td width=\"56\">&nbsp;<\/td>\n<td width=\"107\">&nbsp;<\/td>\n<td width=\"112\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td width=\"53\">&nbsp;<\/td>\n<td width=\"296\">Testing set operating parameters, training of operators and technical staff.<\/td>\n<td width=\"53\">Item<\/td>\n<td width=\"56\">1<\/td>\n<td width=\"107\">10<\/td>\n<td width=\"112\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td width=\"53\">I<\/td>\n<td width=\"296\"><strong><b>Commissioning Maintenance Contract<\/b><\/strong><\/td>\n<td width=\"53\">&nbsp;<\/td>\n<td width=\"56\">&nbsp;<\/td>\n<td width=\"107\">&nbsp;<\/td>\n<td width=\"112\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td width=\"53\">&nbsp;<\/td>\n<td width=\"296\">Before the expiry of the warranty\/signing off, the suppler shall provide a one-year replacement service parts (e.g. filters, air filters), the Quarterly routine maintenance price per quarter for three (3) quarters. Maintenance contract proposal). \u00a0The maintenance contract price includes labour, transport and accommodation for the attending technicians.<\/td>\n<td width=\"53\">Item<\/td>\n<td width=\"56\">3<\/td>\n<td width=\"107\">10<\/td>\n<td width=\"112\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td width=\"53\">&nbsp;<\/td>\n<td width=\"296\"><strong><b>TOTAL <\/b><\/strong><\/td>\n<td width=\"53\">&nbsp;<\/td>\n<td width=\"56\">&nbsp;<\/td>\n<td width=\"107\">&nbsp;<\/p>\n<p>  Quotes that pass the above 3 (3) phases will be contrasted on the basis of prices\/ price approximated and the cheapest valued will definitely be taken into factor to think about the cheapest analyzed proposal in addition to additionally consequently suggested for honour.  <\/td>\n<td width=\"112\"><strong><b>\u00a0<\/b><\/strong><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>  NO  <\/p>\n<\/p>\n<p>  1  <\/p>\n<p>  NO  <\/p>\n<p>  1  <\/p>\n<\/p>\n<p>  Trademark of tenderer  <\/p>\n<p>  Note: In the event of inconsistency in between system cost and total amount, the unit rate will predominate.\n<\/p>\n<\/p>\n<p>  TECHNICAL INCINERATORS SPECS FOR 2 medical facilities  <\/p>\n<\/p>\n<table>\n<tbody>\n<tr>\n<td width=\"70\"><strong><b>ITEM <\/b><\/strong><\/p>\n<p>  INTRO  <\/td>\n<td width=\"186\"><strong><b>ITEM DESCRIPTION<\/b><\/strong><\/td>\n<td width=\"61\"><strong><b>UNIT<\/b><\/strong><\/td>\n<td width=\"115\"><strong><b>QTY. REQUIRED<\/b><\/strong><\/td>\n<td width=\"92\"><strong><b>UNIT PRICE (KHS)<\/b><\/strong><\/td>\n<td width=\"97\"><strong><b>REMARKS<\/b><\/strong><\/td>\n<\/tr>\n<tr>\n<td width=\"70\">1.<\/td>\n<td width=\"186\">Supply, Delivery, installation and commissioning of Incinerator in<\/td>\n<td width=\"61\">&nbsp;<\/p>\n<\/p>\n<p>  The tank requirement to be attached to the burner in a better level to make it possible for free-flow of petrol from the storage area tank to the burner.   <\/p>\n<\/p>\n<\/td>\n<td width=\"115\">&nbsp;<\/p>\n<\/p>\n<p>  EVALUATION STANDARD  <\/td>\n<td width=\"92\"><strong><b>\u00a0<\/b><\/strong><\/td>\n<td width=\"97\"><strong><b>\u00a0<\/b><\/strong><\/td>\n<\/tr>\n<tr>\n<td width=\"70\">2.<\/td>\n<td width=\"186\">Supply, Delivery, installation and commissioning of Incinerator<\/td>\n<td width=\"61\">&nbsp;<\/p>\n<\/p>\n<p>  Evaluation will surely be done in 4 phases particularly first assessment of documents for uniformity with obligatory demands, technical evaluation, website check out and additionally commercial exam.   <\/p>\n<\/p>\n<\/td>\n<td width=\"115\">&nbsp;<\/p>\n<\/p>\n<p>  100  <\/td>\n<td width=\"92\"><strong><b>\u00a0<\/b><\/strong><\/td>\n<td width=\"97\"><strong><b>\u00a0<\/b><\/strong><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>  Pass mark for technical evaluation is 70\/100 marks  <\/p>\n<\/p>\n<p>  Stage 3: Internet Website Browse With  <\/p>\n<\/p>\n<p>  The evaluation committee will surely check out the properties of the prospective purchasers that are receptive to technical analysis stage to validate the credibility of legal documents sent out; establish the validity of the information offered in the tender documents, analyze company &#8217;s capacity, area, to call a few.|<\/p>\n<\/p>\n<ol>\n<li>Form of tender<\/li>\n<li>Contract form<\/li>\n<li>Confidential Questionnaire form<\/li>\n<li>Tender security form<\/li>\n<li>Performance security form<\/li>\n<li>Bank guarantee for advance payment<\/li>\n<li>Declaration form<\/li>\n<\/ol>\n<div class=\"bottomad\">\n\t\t\t\t\t\t\t\t\t\t<script async src=\"\/\/pagead2.googlesyndication.com\/pagead\/js\/adsbygoogle.js\"><\/script><\/p>\n<p>  NO  <\/p><\/div>\n","protected":false},"excerpt":{"rendered":"<p>NO All the incinerators to be supplied and installed must meet the Government of Kenya waste Management Regulation 2006 in particular 3rdschedule regulation (26, 47) pertaining classification, standards, [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":2009,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"_links":{"self":[{"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/posts\/3045"}],"collection":[{"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/comments?post=3045"}],"version-history":[{"count":1,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/posts\/3045\/revisions"}],"predecessor-version":[{"id":10493,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/posts\/3045\/revisions\/10493"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/media\/2009"}],"wp:attachment":[{"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/media?parent=3045"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/categories?post=3045"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/tags?post=3045"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}