{"id":3042,"date":"2024-06-03T01:36:28","date_gmt":"2024-06-03T01:36:28","guid":{"rendered":"https:\/\/www.hiclover.com\/?p=3042"},"modified":"2024-06-03T01:36:28","modified_gmt":"2024-06-03T01:36:28","slug":"large-animal-incinerators","status":"publish","type":"post","link":"https:\/\/gofullday.com\/incineration\/large-animal-incinerators\/","title":{"rendered":"large animal incinerators"},"content":{"rendered":"<p> The incinerator shall also be equipped with special loading apparatus and mechanisms that allow safe incineration of <\/p>\n<p> solid waste simultaneously with liquid sludge.  Loading of solid waste could be achieved through bags.  <\/p>\n<p> &nbsp; <\/p>\n<p> All intermediate piping, bellows and other fittings for connection between the tanks <\/p>\n<p>, burner, compressor and other equipment provided on the slide shall be provided by the successful bidder.  Bidder shall <\/p>\n<p> suggest connection points for sludge, DO and Hot water.  Pipings up to those connection points are going to be on the charge of <\/p>\n<p> the CEB.  All equipment, such as pumps, blower fans, compressors and etc forming part of the incinerator lot will take <\/p>\n<p> their electrical supply from an electrical panel.  The panel should\u00a0 be\u00a0 equipped\u00a0 with\u00a0 proper circuit\u00a0 breakers <\/p>\n<p> and\u00a0 contactors\u00a0 for\u00a0 each component and will allow independent padlocking of the equipment by operators without <\/p>\n<p> intervening from interior of the panel.  All padlocking works will be made from outside the electrical panel.  The <\/p>\n<p> Electrical panel will take supply from an outside 3 phase supply.  <\/p>\n<p> &nbsp; <\/p>\n<p> &nbsp; <\/p>\n<p> 2.4\u00a0 Electrical Panel <\/p>\n<p> &nbsp; <\/p>\n<p> The panel nominal voltage shall be 415 Vac and its rated insulation voltage shall be 1000 Vac.  <\/p>\n<p> &nbsp; <\/p>\n<p> &#8211;\u00a0\u00a0\u00a0\u00a0\u00a0 The main compartment will be fed from an existing switchboard <\/p>\n<p> &nbsp; <\/p>\n<p> &nbsp; <\/p>\n<p> The panel shall be of factory assembled, metal clad and draw-out type in design for outside application.  <\/p>\n","protected":false},"excerpt":{"rendered":"<p>The incinerator shall also be equipped with special loading apparatus and mechanisms that allow safe incineration of solid waste simultaneously with liquid sludge. Loading of solid waste could [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":2012,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"_links":{"self":[{"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/posts\/3042"}],"collection":[{"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/comments?post=3042"}],"version-history":[{"count":1,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/posts\/3042\/revisions"}],"predecessor-version":[{"id":9329,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/posts\/3042\/revisions\/9329"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/media\/2012"}],"wp:attachment":[{"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/media?parent=3042"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/categories?post=3042"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/tags?post=3042"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}