{"id":2970,"date":"2024-04-20T10:51:22","date_gmt":"2024-04-20T10:51:22","guid":{"rendered":"https:\/\/www.hiclover.com\/?p=2970"},"modified":"2024-04-20T10:51:22","modified_gmt":"2024-04-20T10:51:22","slug":"clinical-facility-incinerator-manufacturers","status":"publish","type":"post","link":"https:\/\/gofullday.com\/incineration\/clinical-facility-incinerator-manufacturers\/","title":{"rendered":"clinical facility incinerator manufacturers"},"content":{"rendered":"<div class=\"topad\">\n\t\t\t\t\t\t\t\t\t\t<script async src=\"\/\/pagead2.googlesyndication.com\/pagead\/js\/adsbygoogle.js\"><\/script><\/p>\n<\/div>\n<ul>\n<li>TECHNICAL SPECIFICATIONS OF THE INCINERATOR<\/li>\n<\/ul>\n<ul>\n<li><strong>General<\/strong> <strong>Description<\/strong><\/li>\n<\/ul>\n<p>  SCHEDULE 2  <\/p>\n<\/p>\n<ol>\n<li>Overall plant layout<\/li>\n<li>Feed chamber\/charging<\/li>\n<li>Primary combustion chamber<\/li>\n<li>Particulate scrubbers<\/li>\n<li>Acid gas<\/li>\n<li>The stack\/chimney.<\/li>\n<li>Minimum capacity of primary chamber = 10cubic meters<\/li>\n<li>Burn rate (rate of waste incineration) = 10 kg per hour<\/li>\n<li>Should have a full width counterbalance loading door allowing easy access to the main chamber for loading and removing ash.<\/li>\n<li>The INCINERATOR should be NEMA approved in accordance with Environmental management and coordination (Waste management) Regulations of 2006.<\/li>\n<\/ol>\n<ul>\n<li><strong>Scope Of Work<\/strong><\/li>\n<\/ul>\n<p>  Previous experience in the supply, installation along with appointing of burners  <\/p>\n<\/p>\n<ol>\n<li>Supply, install and commission an incinerator as provided\u00a0\u00a0 in the technical specifications<\/li>\n<\/ol>\n<ol start=\"2\">\n<li>Provision for adherence to OSHA and other statutory requirement relating to Health and Safety of workers during execution of the works covered in this<\/li>\n<\/ol>\n<ol start=\"3\">\n<li>Assessment and preparation\u00a0 and construction of \u00a0a standard incinerator shed with one waste\u00a0 storage room \u00a0( see the design )<\/li>\n<\/ol>\n<ol start=\"4\">\n<li>Provision of operation and maintenance manuals and drawings complete with maintenance schedule and<\/li>\n<\/ol>\n<ol start=\"5\">\n<li>Fuel oil storage tank- Mild steel 1000 liters capacity<\/li>\n<\/ol>\n<ol start=\"6\">\n<li>Onsite training for operation and maintenance<\/li>\n<\/ol>\n<p>  in least10kg per day  <\/p>\n<p>  Basic Strategy design to Supply Overall plant design.   <\/p>\n<p>  Genuine estate centre with one waste storage space <\/p>\n<\/p>\n<ol start=\"3\">\n<li><strong> TECHICAL SPECIFICATIONS OF THE INCINERATOR<\/strong><\/li>\n<\/ol>\n<p>  Deal Real estate designs with ideal cross air flow <\/p>\n<\/p>\n<p>  Chamber (Afterburner Optimum departure temperature must not be much less than 1100oC  <\/p>\n<\/p>\n<ul>\n<li>Primary Combustion<\/li>\n<\/ul>\n<ul>\n<li>This chamber should be equipped with burners that use low sulphur<\/li>\n<li>The chamber should ensure a minimum exit temperature of 850 degrees<\/li>\n<li>This unit should operate at over 1100 deg C to ensure complete<\/li>\n<li>This chamber should be equipped with burners that use low sulphur<\/li>\n<li>Heavy-duty steel casing<\/li>\n<li>High quality refractory lining and insulation<\/li>\n<li>Large full size top load door and liquid retention<\/li>\n<li>1 x oil fired ignition burners operated on\/off<\/li>\n<\/ul>\n<ul>\n<li>Secondary Combustion Chamber (After burner)<\/li>\n<\/ul>\n<ol>\n<li>Heavy-duty steel casing<\/li>\n<li>High quality refractory lining and insulation<\/li>\n<li>1 x oil burner<\/li>\n<li>Should be fitted with burners that use low sulphur<\/li>\n<li>Ensure secondary air supply is controlled.<\/li>\n<li>Ensure residence time is not less than two seconds.<\/li>\n<li>Ensure that the gas temperature as measured against the inside wall in the secondary chamber and not in the flame zone is not less than 1100 degrees<\/li>\n<li>Ensure the emitted oxygen content of the emitted gases is not less than 11%<\/li>\n<li>Ensure both primary and secondary combustion temperatures are maintained until all waste is completely<\/li>\n<\/ol>\n<ul>\n<li>Particulate Removers<\/li>\n<\/ul>\n<p>  Security interlock, Fan Newbie, Heating System on\/ off switch\/door security button, Vehicle coating button, temperature levels regulate device.   <\/p>\n<\/p>\n<ol>\n<li>Cyclone separator<\/li>\n<li>Electrostatic precipitators<\/li>\n<li>Fabric filters<\/li>\n<\/ol>\n<ul>\n<li>Chimney\/Stack<\/li>\n<\/ul>\n<ol>\n<li>The chimney should have a minimum height of 10 meters above ground level and clear the highest point of the building by not less than 3 meters for all The topography and height of adjacent buildings within 50 meters radius should be taken into account.<\/li>\n<li>The chimney should be visible to the operator from the feeding<\/li>\n<\/ol>\n<ol>\n<li>The minimum exit velocity should be 10 meters per second and at least twice the surrounding wind speed (Efflux velocity = wind speed x 2) whichever is higher to ensure no down washing of exiting<\/li>\n<li>The point for measurement of emissions shall be<\/li>\n<\/ol>\n<ul>\n<li>Instrumentation<\/li>\n<\/ul>\n<ol>\n<li>Instrument for determining the inside wall temperature and not burner flame temperature must be provided for both primary and secondary<\/li>\n<li>An audible and visible alarm must be installed to warn the operator when the secondary chamber temperature drops to below the required<\/li>\n<li>A carbon monoxide and oxygen meter\/recorder should be<\/li>\n<li>A smoke density meter\/recorder should be<\/li>\n<li>A solid particulate meter\/recorder should be<\/li>\n<li>Any other instrument that may be considered<\/li>\n<\/ol>\n<ul>\n<li>Location \/ Siting of the Incinerator<\/li>\n<\/ul>\n<ol>\n<li>a) The incinerator must be sited in accordance with the relevant local municipal authority planning regulations and the topography of the site must be compatible with premises in the<\/li>\n<\/ol>\n<ul>\n<li>Emission Limits<\/li>\n<\/ul>\n<ol start=\"99\">\n<li>Combustion efficiency (C.E) shall be at least00% where C.E = %Carbon dioxide x 100 \/ [% Carbon dioxide + carbon monoxide]<\/li>\n<li>The temperature of the primary chamber shall be 800 +\/- 50 degrees centigrade<\/li>\n<li>The secondary chamber gas residence time shall be at least 1 second at 1050 +\/- 50 degrees centigrade with 3% oxygen in the stack<\/li>\n<li>Opacity of the smoke must not exceed 20% viewed from 50 metres with naked<\/li>\n<li>All the emission to the air other than steam or water vapour must be odourless and free of mist, fume and<\/li>\n<li>A 99.99% destruction and removal efficiency (DRE) for each principal organic hazardous constituent (POHC) in the waste feed where DRE [ ( Win &#8211; Wout) \/Win ] x<\/li>\n<\/ol>\n<p>  Key Combustion Chamber Minimum departure temperature level need to not be much less than 850oC  <\/p>\n<ol>\n<li>The average dioxin and furan concentration in the emission should not exceed 80mg\/m3 total dioxins and furans if measured for a period of 6 to 16<\/li>\n<\/ol>\n<ul>\n<li>Ease of Use<\/li>\n<\/ul>\n<ol>\n<li>Auto<\/li>\n<li>No pilots to<\/li>\n<li>Automatic control and temperature monitoring<\/li>\n<li>Built-in skid facilitates placement<\/li>\n<\/ol>\n<ul>\n<li>Fuel Efficiency<\/li>\n<\/ul>\n<ol>\n<li>Rapid incineration means low fuel<\/li>\n<\/ol>\n<ol start=\"2\">\n<li>Up to 20kgs per hour (dependant on application).<\/li>\n<li>Thick refractory lining rated to 1400 deg C in main chamber retains heat, increasing<\/li>\n<\/ol>\n<ul>\n<li>Quality Built to Last<\/li>\n<\/ul>\n<ol>\n<li>Heat resistant 3mm<\/li>\n<li>Stainless steel<\/li>\n<\/ol>\n<ul>\n<li>Key Features<\/li>\n<\/ul>\n<ol>\n<li>Low running and maintenance costs<\/li>\n<li>Fully Automatic and simple to operate control panel<\/li>\n<li>Afterburner Preheat<\/li>\n<li>Incineration Temperatures in Excess of 900 degrees C<\/li>\n<li>3 mm Steel Casing and Fully insulated<\/li>\n<li>Dense Refractory Concrete Lining Rated to 1400 degrees C<\/li>\n<li>Solid Hearth to Allow Maximum Burnout<\/li>\n<li>Large Top Opening Lid For Easy Loading<\/li>\n<li>Stainless Steel Flue as standard<\/li>\n<li>12 Months or 1000 hours<\/li>\n<li>Optional Stainless Steel Casing<\/li>\n<li>Heat Recovery System option<\/li>\n<\/ol>\n<table>\n<tbody>\n<tr>\n<td width=\"46\"><strong>3.13<\/strong><\/td>\n<td width=\"192\"><strong>Fuel and Capacity<\/strong><\/td>\n<td rowspan=\"2\" width=\"42\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td width=\"46\">1.<\/td>\n<td width=\"192\">Low sulphur fuel<\/td>\n<\/tr>\n<tr>\n<td width=\"46\">2.<\/td>\n<td width=\"192\">Capacity (Cubic Mtr)<\/td>\n<td width=\"42\">.10<\/td>\n<\/tr>\n<tr>\n<td width=\"46\">3.<\/td>\n<td width=\"192\">Average Capacity<\/td>\n<td width=\"42\">40kg<\/td>\n<\/tr>\n<tr>\n<td width=\"46\">4.<\/td>\n<td width=\"192\">Fuel Consumption (ltrs \/ hr)<\/td>\n<td width=\"42\">3<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<ul>\n<li>External Dimensions<\/li>\n<\/ul>\n<table>\n<tbody>\n<tr>\n<td width=\"22\">1.<\/td>\n<td width=\"186\">Length (mm)\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 735<\/td>\n<td rowspan=\"2\" width=\"80\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td width=\"22\">2.<\/td>\n<td width=\"186\">Width (mm)\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 500<\/td>\n<\/tr>\n<tr>\n<td width=\"22\">3.<\/td>\n<td width=\"186\">Height Incl. Flue (mm)<\/td>\n<td width=\"80\">1960<\/td>\n<\/tr>\n<tr>\n<td width=\"22\">4.<\/td>\n<td width=\"186\">Door Opening (mm)<\/td>\n<td width=\"80\">325 x 325<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<ul>\n<li><strong>Internal Dimensions<\/strong><\/li>\n<\/ul>\n<table>\n<tbody>\n<tr>\n<td width=\"22\">1.<\/td>\n<td width=\"144\">Length (mm)<\/td>\n<td width=\"85\">620<\/td>\n<\/tr>\n<tr>\n<td width=\"22\">2.<\/td>\n<td width=\"144\">Width (mm)<\/td>\n<td width=\"85\">390<\/td>\n<\/tr>\n<tr>\n<td width=\"22\">3.<\/td>\n<td width=\"144\">Height<\/td>\n<td width=\"85\">500<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<ul>\n<li><strong>Operation<\/strong><\/li>\n<\/ul>\n<ol>\n<li>Minimum Operating Temperature 950<\/li>\n<li>Maximum Operating Temperature 1320<\/li>\n<\/ol>\n<table>\n<tbody>\n<tr>\n<td width=\"22\">3.<\/td>\n<td width=\"207\">Burn rate per hour<\/td>\n<td width=\"108\">5-20kgs<\/td>\n<\/tr>\n<tr>\n<td width=\"22\">4.<\/td>\n<td width=\"207\">Temperature Monitoring<\/td>\n<td width=\"108\">Available<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<ul>\n<li>Particulate Removers<\/li>\n<\/ul>\n<p>  Second Burning Optimum leave temperature level need to be no lot less than 1100oC  <\/p>\n<\/p>\n<ol>\n<li>Cyclone separator<\/li>\n<li>Electrostatic precipitators<\/li>\n<li>Fabric filters<\/li>\n<\/ol>\n<ul>\n<li>Chimney \/Stack<\/li>\n<\/ul>\n<ul>\n<li>The chimney should have a minimum height of 10 meters above ground level and clear the highest point of the building by not less than 3 meters for all The topography and height of adjacent buildings within 50 meters radius should be taken into account.<\/li>\n<li>If possible the chimney should be visible to the operator from the feeding<\/li>\n<li>The addition of dilution air after combustion in order to achieve the requirement of these guidelines is<\/li>\n<li>The minimum exit velocity should be 10 m\/s and at least twice the surrounding wind speed (Efflux velocity = wind speed x 2) whichever is higher to ensure no down washing of exiting<\/li>\n<li>Point for the measurement of emissions shall be<\/li>\n<\/ul>\n<ul>\n<li>Control Panel<\/li>\n<\/ul>\n<ol>\n<li>Control of 2 burners<\/li>\n<li>Timer control 0- 12 hours<\/li>\n<li>Integral fan timer control<\/li>\n<li>Temperature and thermostatic control<\/li>\n<\/ol>\n<p>  SECTION VII  <\/p>\n<\/p>\n<table>\n<tbody>\n<tr>\n<td width=\"44\"><strong>NO:<\/strong><\/td>\n<td width=\"395\">REQUIREMENTS<\/td>\n<td width=\"219\"><strong>SUPPLIER\u2019S REMARKS<\/strong><\/td>\n<\/tr>\n<tr>\n<td width=\"44\"><strong>1.<\/strong><\/td>\n<td width=\"395\"><strong><em>Experience<\/em><\/strong><\/p>\n<\/p>\n<p>  COST TIMETABLE FOR THING  <\/td>\n<td width=\"219\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td width=\"44\"><strong>2.<\/strong><\/td>\n<td width=\"395\">1 Year Maintenance Contract<\/td>\n<td width=\"219\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td width=\"44\"><strong>3.<\/strong><\/td>\n<td width=\"395\"><strong><em>Work rate<\/em><\/strong><\/p>\n<\/p>\n<p>  Cost schedule for Supply, Installment, Checking out as well as Appointing of an incinerator for Turkwel Power Terminal  <\/td>\n<td width=\"219\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td width=\"44\"><strong>4.<\/strong><\/td>\n<td width=\"395\"><strong><em>Design<\/em><\/strong><\/p>\n<\/p>\n<p>  WONDERFUL BARGAIN  <\/p>\n<\/p>\n<p>  1  <\/p>\n<\/p>\n<p>  49,50,51,60,61,77,78,79,80,81,100  <\/p>\n<p>  ENTIRE WHOLE LOT  <\/p>\n<\/p>\n<p>  GREAT DEAL  <\/p>\n<\/p>\n<p>  Offer Home styles with appropriate cross air flow  <\/td>\n<td width=\"219\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td width=\"44\"><strong>5.<\/strong><\/td>\n<td width=\"395\"><strong><em>Standard control panel<\/em><\/strong><\/p>\n<\/p>\n<p>  Chamber (Afterburner Maximum departure temperature should not be less than 1100oC  <\/td>\n<td width=\"219\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td width=\"44\"><strong>6.<\/strong><\/td>\n<td width=\"395\"><strong><em>Combustion Chambers<\/em><\/strong><\/p>\n<\/p>\n<p>  Security interlock, Follower Beginner, Heater on\/ off switch\/door safety switch, Car fold button, temperature levels regulate apparatus.   <\/p>\n<\/p>\n<p>  Key Combustion Chamber Minimum departure temperature level must not be much less than 850oC  <\/td>\n<td width=\"219\">&nbsp;<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>  Second Combustion Optimum leave temperature level need to be less than 1100oC  <\/p>\n<\/p>\n<p>  SECTION VII  <\/p>\n<\/p>\n<p>  PRICE SCHEDULE FOR ITEM  <\/p>\n<\/p>\n<table>\n<tbody>\n<tr>\n<td width=\"48\">1<\/td>\n<td width=\"282\">2<\/td>\n<td width=\"54\">3<\/td>\n<td width=\"84\">4<\/td>\n<td width=\"72\">5<\/td>\n<td width=\"96\">6<\/td>\n<\/tr>\n<tr>\n<td width=\"48\"><strong>Item<\/strong><\/td>\n<td width=\"282\"><strong>Description<\/strong><\/td>\n<td width=\"54\"><strong>Unit of sale<\/strong><\/td>\n<td width=\"84\"><strong>Quantity<\/strong><\/td>\n<td width=\"72\"><strong>Unit price<\/strong><\/td>\n<td width=\"96\"><strong>Total price<\/strong><\/td>\n<\/tr>\n<tr>\n<td width=\"48\">1.<\/td>\n<td width=\"282\">Supply, install, and commission the incinerator as specified.<\/td>\n<td width=\"54\">LOT<\/td>\n<td width=\"84\">1<\/td>\n<td width=\"72\">&nbsp;<\/td>\n<td width=\"96\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td width=\"48\">2.<\/td>\n<td width=\"282\">Construct a standard incinerator housing facility as per the drawing and architectural notes provided<\/td>\n<td width=\"54\"><strong>\u00a0<\/strong><\/p>\n<p>  Rate schedule for Supply, Installment, Examining in Addition to Commissioning of an incinerator for Turkwel Power Station  <\/td>\n<td width=\"84\"><strong>\u00a0<\/strong><\/p>\n<p>  GREAT DEAL  <\/td>\n<td width=\"72\">&nbsp;<\/td>\n<td width=\"96\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td width=\"48\">4.<\/td>\n<td width=\"282\">Construct one\u00a0 waste\u00a0 storage\u00a0 room (provide specs on room size, construction material etc)<\/td>\n<td width=\"54\">LOT<\/td>\n<td width=\"84\">1<\/td>\n<td width=\"72\">&nbsp;<\/td>\n<td width=\"96\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td width=\"48\">5.<\/td>\n<td width=\"282\">Supply \/ adhere to\u00a0 the requirement of OSHA 2007 act<\/p>\n<p>  1  <\/td>\n<td width=\"54\">LOT<\/td>\n<td width=\"84\">1<\/td>\n<td width=\"72\">&nbsp;<\/td>\n<td width=\"96\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td width=\"48\">6.<\/td>\n<td width=\"282\">Onsite training of Operation and Maintenance staff.<\/td>\n<td width=\"54\">LOT<\/td>\n<td width=\"84\">1<\/td>\n<td width=\"72\">&nbsp;<\/td>\n<td width=\"96\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td width=\"48\">7.<\/td>\n<td width=\"282\">All the key Spares (Attach a separate List)<\/td>\n<td width=\"54\">LOT<\/td>\n<td width=\"84\">1<\/td>\n<td width=\"72\">&nbsp;<\/td>\n<td width=\"96\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td width=\"48\">8.<\/td>\n<td width=\"282\">Supply and install 1000 liters Fuel oil storage tank and its secondary containment with Diesel oil level indicator and necessary piping with valves for visual checking of fuel level.<\/td>\n<td width=\"54\">LOT<\/td>\n<td width=\"84\">1<\/td>\n<td width=\"72\">&nbsp;<\/td>\n<td width=\"96\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td width=\"48\">9.<\/td>\n<td width=\"282\">Supply of Operation and Maintenance Manuals.<\/td>\n<td width=\"54\"><strong>\u00a0<\/strong><\/p>\n<p>  49,50,51,60,61,77,78,79,80,81,100  <\/td>\n<td width=\"84\">1<\/td>\n<td width=\"72\">&nbsp;<\/td>\n<td width=\"96\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td width=\"48\">10.<\/td>\n<td width=\"282\">All other items not specified but necessary to complete the Installation.\u00a0\u00a0 A separate list of these items to be attached.<\/td>\n<td width=\"54\"><strong>\u00a0<\/strong><\/p>\n<p>  WHOLE LOT  <\/td>\n<td width=\"84\">1<\/td>\n<td width=\"72\">&nbsp;<\/td>\n<td width=\"96\">&nbsp;<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<table>\n<tbody>\n<tr>\n<td width=\"48\">11.<\/td>\n<td width=\"282\">Fencing of\u00a0 a compound \u00a0of 10 meter length\u00a0 by 10 meter\u00a0 width\u00a0\u00a0 using Concrete\u00a0 poles\u00a0 high Gauge mesh wire , and a lockable gate. (Indicate size and design of gate)<\/td>\n<td width=\"54\">LOT<\/td>\n<td width=\"84\">1<\/td>\n<td width=\"72\">&nbsp;<\/td>\n<td width=\"96\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td width=\"48\">&nbsp;<\/td>\n<td width=\"282\">Sub Total<\/td>\n<td width=\"54\">&nbsp;<\/td>\n<td width=\"84\">&nbsp;<\/td>\n<td width=\"72\">&nbsp;<\/td>\n<td width=\"96\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td width=\"48\">&nbsp;<\/td>\n<td width=\"282\">&nbsp;<\/td>\n<td width=\"54\">&nbsp;<\/td>\n<td width=\"84\">&nbsp;<\/td>\n<td width=\"72\">&nbsp;<\/td>\n<td width=\"96\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td width=\"48\">&nbsp;<\/td>\n<td width=\"282\">Discount\u00a0 (%) if any<\/td>\n<td width=\"54\">&nbsp;<\/td>\n<td width=\"84\">&nbsp;<\/td>\n<td width=\"72\">&nbsp;<\/td>\n<td width=\"96\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td width=\"48\">&nbsp;<\/td>\n<td width=\"282\">Applicable Taxes and Duties<\/td>\n<td width=\"54\">&nbsp;<\/td>\n<td width=\"84\">&nbsp;<\/td>\n<td width=\"72\">&nbsp;<\/td>\n<td width=\"96\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td width=\"48\">&nbsp;<\/td>\n<td width=\"282\">&nbsp;<\/td>\n<td width=\"54\">&nbsp;<\/td>\n<td width=\"84\">&nbsp;<\/td>\n<td width=\"72\">&nbsp;<\/td>\n<td width=\"96\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td width=\"48\">&nbsp;<\/td>\n<td width=\"282\">Total Cost in Kshs<\/td>\n<td width=\"54\">&nbsp;<\/td>\n<td width=\"84\">&nbsp;<\/td>\n<td width=\"72\">&nbsp;<\/td>\n<td width=\"96\">&nbsp;<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<div class=\"bottomad\">\n\t\t\t\t\t\t\t\t\t\t<script async src=\"\/\/pagead2.googlesyndication.com\/pagead\/js\/adsbygoogle.js\"><\/script><\/p>\n<p>  LOT  <\/p><\/div>\n","protected":false},"excerpt":{"rendered":"<p>TECHNICAL SPECIFICATIONS OF THE INCINERATOR General Description SCHEDULE 2 Overall plant layout Feed chamber\/charging Primary combustion chamber Particulate scrubbers Acid gas The stack\/chimney. Minimum capacity of primary chamber [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":2011,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"_links":{"self":[{"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/posts\/2970"}],"collection":[{"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/comments?post=2970"}],"version-history":[{"count":1,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/posts\/2970\/revisions"}],"predecessor-version":[{"id":9526,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/posts\/2970\/revisions\/9526"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/media\/2011"}],"wp:attachment":[{"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/media?parent=2970"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/categories?post=2970"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/tags?post=2970"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}