{"id":2577,"date":"2025-01-23T15:18:09","date_gmt":"2025-01-23T15:18:09","guid":{"rendered":"https:\/\/www.hiclover.com\/?p=2577"},"modified":"2025-01-23T15:18:09","modified_gmt":"2025-01-23T15:18:09","slug":"biomedical-waste-heater-10-15-kg","status":"publish","type":"post","link":"https:\/\/gofullday.com\/incineration\/biomedical-waste-heater-10-15-kg\/","title":{"rendered":"Biomedical Waste Heater, 10-15 KG."},"content":{"rendered":"<div class=\"topad\">\n\t\t\t\t\t\t\t\t\t\t<script async src=\"\/\/pagead2.googlesyndication.com\/pagead\/js\/adsbygoogle.js\"><\/script><\/p>\n<\/div>\n<div class=\"bottomad\">\n\t\t\t\t\t\t\t\t\t\t<script async src=\"\/\/pagead2.googlesyndication.com\/pagead\/js\/adsbygoogle.js\"><\/script><\/p>\n<p> The first is a little<br \/>\nShall\u00a0provide\u00a0ladder\u00a0till\u00a0the\u00a0top.<br \/>\nIt\u00a0shall\u00a0be\u00a0operated\u00a0by\u00a0manual\u00a0and\u00a0automatic mode.<br \/>\nCombustion\u00a0Fan:<br \/>\nMaterial\u00a0of\u00a0construction\u00a0of\u00a0outer\u00a0body:\u00a0Mild\u00a0Steel\u00a0refractory\u00a0lined\u00a0from\u00a0interior.<br \/>\nSecond is a 500kg per\/hr incinerator for a company planning to begin a<br \/>\nI.D.\u00a0Fan:<br \/>\nIt\u00a0shall\u00a0have\u00a0separate\u00a0digital\u00a0display\u00a0of\u00a0temperature\u00a0for\u00a0both\u00a0chambers.<br \/>\nC.E.=\u00a0__%CO2______\u00a0x\u00a0100<br \/>\nMaterial\u00a0of\u00a0Construction:\u00a0Mild\u00a0Steel,\u00a05mm\u00a0thick<br \/>\nBidder\u00a0shall\u00a0submit\u00a0detail\u00a0drawings,\u00a0design,\u00a0and\u00a0layout\u00a0plan\u00a0of\u00a0civil\u00a0functions.<br \/>\nVolatile\u00a0organic\u00a0compounds\u00a0in\u00a0ash\u00a0shall\u00a0not\u00a0be\u00a0more\u00a0than\u00a00.01%.<br \/>\nProgress,\u00a0in\u00a0detail.<br \/>\nSecondary\u00a0chamber\u00a0gas\u00a0residence\u00a0time\u00a0shall\u00a0be\u00a0minimum\u00a01\u00a0second\u00a0at\u00a01050\u00a0oC.<br \/>\nBrand:<br \/>\nChimney\u00a0of\u00a030\u00a0meters\u00a0Height:<br \/>\nRefractory:\u00a075mm\u00a0thick\u00a0castable.{<br \/>\n(adsbygoogle = window.adsbygoogle || []).push({});|}<br \/>\nStandards\u00a0and\u00a0Safety\u00a0Requirements<br \/>\nMust\u00a0provide\u00a0user\u00a0training\u00a0(like how\u00a0to\u00a0use\u00a0and\u00a0maintain\u00a0the\u00a0equipment).<br \/>\nOperational\u00a0Requirements<br \/>\nRe-\u00a0Circulation\u00a0Pump\u00a0for\u00a0Venturi\u00a0Scrubber<br \/>\nSubstance:\u00a0Refractory\u00a0bricks\u00a0confirming\u00a0to\u00a0international\u00a0standard.<br \/>\nMaterial\u00a0of\u00a0Construction:\u00a0Mild\u00a0steel.<br \/>\nport.<br \/>\nCorrective\/breakdown\u00a0maintenance\u00a0whenever\u00a0required.<br \/>\nIt\u00a0shall\u00a0have\u00a0to\u00a0reduce\u00a0flue\u00a0gas\u00a0temperature\u00a0prior to venturi\u00a0scrubber.<br \/>\nAll\u00a0compulsory approvals\u00a0required\u00a0for\u00a0the\u00a0installation\u00a0and\u00a0operation\u00a0of\u00a0incinerator\u00a0shall\u00a0be\u00a0done<br \/>\nTemperature:\u00a0Main Chamber\u00a0800\u00a0\u00b1\u00a050\u00a0oC,\u00a0Secondary\u00a0Chamber\u00a01050\u00a0\u00b1\u00a050\u00a0oC.<br \/>\nMaterial\u00a0of\u00a0Construction:\u00a0Mild\u00a0Steel\u00a0Rubber\u00a0lined\u00a03mm\u00a0thick<br \/>\nEpoxy\u00a0powder\u00a0coated\u00a0washable\u00a0paint\u00a0finish.<br \/>\nMaterial\u00a0of\u00a0Construction:\u00a0Mild\u00a0Steel<br \/>\nIt\u00a0shall\u00a0have\u00a0audio-visual\u00a0alarm\u00a0system.<br \/>\nDestruction\u00a0Efficiency:\u00a099%.<br \/>\nCertification of\u00a0calibration\u00a0and\u00a0inspection\u00a0from\u00a0factory.  <\/p><\/div>\n","protected":false},"excerpt":{"rendered":"<p>The first is a little Shall\u00a0provide\u00a0ladder\u00a0till\u00a0the\u00a0top. It\u00a0shall\u00a0be\u00a0operated\u00a0by\u00a0manual\u00a0and\u00a0automatic mode. Combustion\u00a0Fan: Material\u00a0of\u00a0construction\u00a0of\u00a0outer\u00a0body:\u00a0Mild\u00a0Steel\u00a0refractory\u00a0lined\u00a0from\u00a0interior. Second is a 500kg per\/hr incinerator for a company planning to begin a I.D.\u00a0Fan: It\u00a0shall\u00a0have\u00a0separate\u00a0digital\u00a0display\u00a0of\u00a0temperature\u00a0for\u00a0both\u00a0chambers. C.E.=\u00a0__%CO2______\u00a0x\u00a0100 Material\u00a0of\u00a0Construction:\u00a0Mild\u00a0Steel,\u00a05mm\u00a0thick Bidder\u00a0shall\u00a0submit\u00a0detail\u00a0drawings,\u00a0design,\u00a0and\u00a0layout\u00a0plan\u00a0of\u00a0civil\u00a0functions. [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":2022,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"_links":{"self":[{"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/posts\/2577"}],"collection":[{"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/comments?post=2577"}],"version-history":[{"count":1,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/posts\/2577\/revisions"}],"predecessor-version":[{"id":9255,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/posts\/2577\/revisions\/9255"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/media\/2022"}],"wp:attachment":[{"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/media?parent=2577"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/categories?post=2577"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/gofullday.com\/incineration\/wp-json\/wp\/v2\/tags?post=2577"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}