- TECHNICAL SPECIFICATIONS OF THE INCINERATOR
SCHEDULE 2
- Overall plant layout
- Feed chamber/charging
- Primary combustion chamber
- Particulate scrubbers
- Acid gas
- The stack/chimney.
- Minimum capacity of primary chamber = 10cubic meters
- Burn rate (rate of waste incineration) = 10 kg per hour
- Should have a full width counterbalance loading door allowing easy access to the main chamber for loading and removing ash.
- The INCINERATOR should be NEMA approved in accordance with Environmental management and coordination (Waste management) Regulations of 2006.
Previous experience in the supply, installation along with appointing of burners
- Supply, install and commission an incinerator as provided in the technical specifications
- Provision for adherence to OSHA and other statutory requirement relating to Health and Safety of workers during execution of the works covered in this
- Assessment and preparation and construction of a standard incinerator shed with one waste storage room ( see the design )
- Provision of operation and maintenance manuals and drawings complete with maintenance schedule and
- Fuel oil storage tank- Mild steel 1000 liters capacity
- Onsite training for operation and maintenance
in least10kg per day
Basic Strategy design to Supply Overall plant design.
Genuine estate centre with one waste storage space
- TECHICAL SPECIFICATIONS OF THE INCINERATOR
Deal Real estate designs with ideal cross air flow
Chamber (Afterburner Optimum departure temperature must not be much less than 1100oC
- This chamber should be equipped with burners that use low sulphur
- The chamber should ensure a minimum exit temperature of 850 degrees
- This unit should operate at over 1100 deg C to ensure complete
- This chamber should be equipped with burners that use low sulphur
- Heavy-duty steel casing
- High quality refractory lining and insulation
- Large full size top load door and liquid retention
- 1 x oil fired ignition burners operated on/off
- Secondary Combustion Chamber (After burner)
- Heavy-duty steel casing
- High quality refractory lining and insulation
- 1 x oil burner
- Should be fitted with burners that use low sulphur
- Ensure secondary air supply is controlled.
- Ensure residence time is not less than two seconds.
- Ensure that the gas temperature as measured against the inside wall in the secondary chamber and not in the flame zone is not less than 1100 degrees
- Ensure the emitted oxygen content of the emitted gases is not less than 11%
- Ensure both primary and secondary combustion temperatures are maintained until all waste is completely
Security interlock, Fan Newbie, Heating System on/ off switch/door security button, Vehicle coating button, temperature levels regulate device.
- Cyclone separator
- Electrostatic precipitators
- Fabric filters
- The chimney should have a minimum height of 10 meters above ground level and clear the highest point of the building by not less than 3 meters for all The topography and height of adjacent buildings within 50 meters radius should be taken into account.
- The chimney should be visible to the operator from the feeding
- The minimum exit velocity should be 10 meters per second and at least twice the surrounding wind speed (Efflux velocity = wind speed x 2) whichever is higher to ensure no down washing of exiting
- The point for measurement of emissions shall be
- Instrument for determining the inside wall temperature and not burner flame temperature must be provided for both primary and secondary
- An audible and visible alarm must be installed to warn the operator when the secondary chamber temperature drops to below the required
- A carbon monoxide and oxygen meter/recorder should be
- A smoke density meter/recorder should be
- A solid particulate meter/recorder should be
- Any other instrument that may be considered
- Location / Siting of the Incinerator
- a) The incinerator must be sited in accordance with the relevant local municipal authority planning regulations and the topography of the site must be compatible with premises in the
- Combustion efficiency (C.E) shall be at least00% where C.E = %Carbon dioxide x 100 / [% Carbon dioxide + carbon monoxide]
- The temperature of the primary chamber shall be 800 +/- 50 degrees centigrade
- The secondary chamber gas residence time shall be at least 1 second at 1050 +/- 50 degrees centigrade with 3% oxygen in the stack
- Opacity of the smoke must not exceed 20% viewed from 50 metres with naked
- All the emission to the air other than steam or water vapour must be odourless and free of mist, fume and
- A 99.99% destruction and removal efficiency (DRE) for each principal organic hazardous constituent (POHC) in the waste feed where DRE [ ( Win – Wout) /Win ] x
Key Combustion Chamber Minimum departure temperature level need to not be much less than 850oC
- The average dioxin and furan concentration in the emission should not exceed 80mg/m3 total dioxins and furans if measured for a period of 6 to 16
- Auto
- No pilots to
- Automatic control and temperature monitoring
- Built-in skid facilitates placement
- Rapid incineration means low fuel
- Up to 20kgs per hour (dependant on application).
- Thick refractory lining rated to 1400 deg C in main chamber retains heat, increasing
- Heat resistant 3mm
- Stainless steel
- Low running and maintenance costs
- Fully Automatic and simple to operate control panel
- Afterburner Preheat
- Incineration Temperatures in Excess of 900 degrees C
- 3 mm Steel Casing and Fully insulated
- Dense Refractory Concrete Lining Rated to 1400 degrees C
- Solid Hearth to Allow Maximum Burnout
- Large Top Opening Lid For Easy Loading
- Stainless Steel Flue as standard
- 12 Months or 1000 hours
- Optional Stainless Steel Casing
- Heat Recovery System option
3.13 | Fuel and Capacity | |
1. | Low sulphur fuel | |
2. | Capacity (Cubic Mtr) | .10 |
3. | Average Capacity | 40kg |
4. | Fuel Consumption (ltrs / hr) | 3 |
1. | Length (mm) 735 | |
2. | Width (mm) 500 | |
3. | Height Incl. Flue (mm) | 1960 |
4. | Door Opening (mm) | 325 x 325 |
1. | Length (mm) | 620 |
2. | Width (mm) | 390 |
3. | Height | 500 |
- Minimum Operating Temperature 950
- Maximum Operating Temperature 1320
3. | Burn rate per hour | 5-20kgs |
4. | Temperature Monitoring | Available |
Second Burning Optimum leave temperature level need to be no lot less than 1100oC
- Cyclone separator
- Electrostatic precipitators
- Fabric filters
- The chimney should have a minimum height of 10 meters above ground level and clear the highest point of the building by not less than 3 meters for all The topography and height of adjacent buildings within 50 meters radius should be taken into account.
- If possible the chimney should be visible to the operator from the feeding
- The addition of dilution air after combustion in order to achieve the requirement of these guidelines is
- The minimum exit velocity should be 10 m/s and at least twice the surrounding wind speed (Efflux velocity = wind speed x 2) whichever is higher to ensure no down washing of exiting
- Point for the measurement of emissions shall be
- Control of 2 burners
- Timer control 0- 12 hours
- Integral fan timer control
- Temperature and thermostatic control
SECTION VII
NO: | REQUIREMENTS | SUPPLIER’S REMARKS |
1. | Experience
COST TIMETABLE FOR THING |
|
2. | 1 Year Maintenance Contract | |
3. | Work rate
Cost schedule for Supply, Installment, Checking out as well as Appointing of an incinerator for Turkwel Power Terminal |
|
4. | Design
WONDERFUL BARGAIN 1 49,50,51,60,61,77,78,79,80,81,100 ENTIRE WHOLE LOT GREAT DEAL Offer Home styles with appropriate cross air flow |
|
5. | Standard control panel
Chamber (Afterburner Maximum departure temperature should not be less than 1100oC |
|
6. | Combustion Chambers
Security interlock, Follower Beginner, Heater on/ off switch/door safety switch, Car fold button, temperature levels regulate apparatus. Key Combustion Chamber Minimum departure temperature level must not be much less than 850oC |
Second Combustion Optimum leave temperature level need to be less than 1100oC
SECTION VII
PRICE SCHEDULE FOR ITEM
1 | 2 | 3 | 4 | 5 | 6 |
Item | Description | Unit of sale | Quantity | Unit price | Total price |
1. | Supply, install, and commission the incinerator as specified. | LOT | 1 | ||
2. | Construct a standard incinerator housing facility as per the drawing and architectural notes provided |
Rate schedule for Supply, Installment, Examining in Addition to Commissioning of an incinerator for Turkwel Power Station |
GREAT DEAL |
||
4. | Construct one waste storage room (provide specs on room size, construction material etc) | LOT | 1 | ||
5. | Supply / adhere to the requirement of OSHA 2007 act
1 |
LOT | 1 | ||
6. | Onsite training of Operation and Maintenance staff. | LOT | 1 | ||
7. | All the key Spares (Attach a separate List) | LOT | 1 | ||
8. | Supply and install 1000 liters Fuel oil storage tank and its secondary containment with Diesel oil level indicator and necessary piping with valves for visual checking of fuel level. | LOT | 1 | ||
9. | Supply of Operation and Maintenance Manuals. |
49,50,51,60,61,77,78,79,80,81,100 |
1 | ||
10. | All other items not specified but necessary to complete the Installation. A separate list of these items to be attached. |
WHOLE LOT |
1 |
11. | Fencing of a compound of 10 meter length by 10 meter width using Concrete poles high Gauge mesh wire , and a lockable gate. (Indicate size and design of gate) | LOT | 1 | ||
Sub Total | |||||
Discount (%) if any | |||||
Applicable Taxes and Duties | |||||
Total Cost in Kshs |